BAT 11b
Release 1.0 03/04
2-11
Safety instructions
U
Supply voltage
The devices are designed for operation with a safety extra-low voltage.
They may only be connected to the supply voltage connections and to
the signal contact with PELV circuits or alternatively SELV circuits with
the voltage restrictions in accordance with IEC/EN 60950.
The supply voltage is electrically isolated from the housing.
V
Never start operation with damaged components!
V
Relevant for North America:
The subject unit is to be suppplied by a Class 2 power source
complying with the requirements of the National Electrical Code, table
11(b). If power is redundant supplied (two individual power sources)
the power sources together should comply with the requirements of
the National Electrical Code, table 11 (b).
V
Relevant for North America:
Use 60/75°C or 75°C copper(CU)wire only.
U
Shielding ground
The shielding ground of the connectable twisted pair lines is connected
to the front panel as a conductor.
V
Beware of possible short circuits when connecting a cable section with
conductive shielding braiding.
Summary of Contents for BAT 11b
Page 1: ...BAT 11b Management Manual Industrial ETHERNET Wireless LAN Access Point Access Client...
Page 2: ......
Page 3: ...BAT 11b Management Manual Industrial ETHERNET Wireless LAN Access Point Access Client...
Page 8: ...2 8 BAT 11b Release 1 0 03 04...
Page 10: ...2 10 BAT 11b Release 1 0 03 04...
Page 16: ...2 16 BAT 11b Release 1 0 03 04...
Page 24: ...Objectives 24 BAT 11b Release 1 0 03 04...
Page 56: ...How to Exit the BAT Discovery 56 BAT 11b Release 1 0 03 04...
Page 82: ...Configuration Administration 82 BAT 11b Release 1 0 03 04...
Page 103: ...Configuration Security 103 BAT 11b Release 1 0 03 04 Configuration Security...
Page 108: ...Configuration Administration 108 BAT 11b Release 1 0 03 04...
Page 124: ...How to Reset the Password 124 BAT 11b Release 1 0 03 04...
Page 127: ......
Page 128: ......