48
4
4))
Go to front of fryer control panel for vat with suspect probe, loosed retaining
screw with Philip’s-head screwdriver and hinge control panel down.
5
5))
Disconnect 12-pin connector at left side of control panel and place connector on
flat surface with the open side up.
6
6))
Hold connector in place with one hand, use other hand to insert pocket knife
blade or other small sharp tool into connector notch to depress metal locking
tab.
7
7))
Continue to hold locking tab down and pull lead wire out of the rear of connector
and remove probe from fryer.
8
8))
Place nut and new ferrule on new oil level probe and insert probe into
compression fitting.
9
9))
Locate temperature probe through pot wall.
1
10
0))
Place gauge against pot wall as shows in
Summary of Contents for LVE-202
Page 2: ......
Page 6: ...Contents iv...
Page 8: ...Preface vi...
Page 24: ...Info Filter Temp Button Stats 12...
Page 32: ...Level 2 Programming 20...
Page 50: ...Maintenance 38 NOTE Oil temp must be 380 F 193 C to perform this check...
Page 88: ...Maintenance 76...
Page 90: ......
Page 91: ......
Page 92: ...Wiring Diagrams 155...
Page 93: ...Wiring Diagrams 156...
Page 94: ...Wiring Diagrams 157...
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ...Wiring Diagrams 161...
Page 99: ...Wiring Diagrams 162...
Page 100: ...Wiring Diagrams 163...
Page 101: ...Wiring Diagrams 164...
Page 102: ...Wiring Diagrams 165...
Page 103: ...Wiring Diagrams 166...
Page 104: ...Wiring Diagrams 167...
Page 105: ...Wiring Diagrams 168...
Page 106: ...Wiring Diagrams 169...
Page 107: ...Wiring Diagrams 170...
Page 108: ...Wiring Diagrams 171...
Page 109: ...Wiring Diagrams 172...
Page 111: ...Wiring Diagrams 174...
Page 112: ...Wiring Diagrams 175 Figure 10 1 Plumbing Diagram...
Page 113: ...Wiring Diagrams 176...
Page 114: ...blank page...