57
seasOn start-uP Maintenance checKList
To begin season start-up of your Heatmor Outdoor Furnace, assuming you followed the procedures
outlined in the “End of Season Maintenance Checklist,” follow the instructions below:
1. Remove cap from chimney.
2. Build fire in firepot and bring your furnace up to temperature. (Refer to the “Lighting the Heatmor
TM
for the
first time” section of the Heatmor
TM
Operations and Maintenance Manual.)
3. Once your furnace is up to temperature, you can start all pumps.
cautiOn:
It is recommended to start your pumps AFTER you bring your furnace up to temperature. This
helps ensure your system isn’t air locked and ensure your water is circuating correctly.
4. Your start-up is complete.
enD OF seasOn Maintenance checKList
To begin End of Season Shutdown of your Heatmor™ Outdoor Furnace, follow the instructions below:
1. Turn off pump(s).
2. Clean Flue (Refer to the “Flue” section of the Heatmor
TM
Operations and Maintenance Manual.)
a) Remove Flue Covers
b) Using the flue scrapers provided with the HEATMOR™ furnace clean all areas of the flue.
c) Re-attach the flue cover plates, making sure to tighten the nuts to make an airtight seal.
3. Clean ashes out of Firebox. (Refer to the “Ashes” section of the Heatmor
TM
Operations and Maintenance
Manual.)
a) Thoroughly pull ashes from sides and corners of Firebox.
4. Clean ashes out of Ash Pan. (Refer to the “Ashes” section of the Heatmor
TM
Operations and
Maintenance Manual.)
5. Place cap on Chimney. There is no specific product sold for this use, but a five gallon bucket or
something similar will cover the chimney keeping unwanted moisture and visitors away.
6. Spray oil on the auger chain.
chaPter 21
Summary of Contents for 200 SSP
Page 1: ...Outdoor Furnaces TM save these instructions...
Page 8: ...3 EPA PHASE 2 HANGTAG MODEL 200 SSP...
Page 9: ...4...
Page 10: ...5 HEATMOR Stainless Steel PELLET BURNER Outdoor Furnace Model Chapter 1 Model 200 SSP...
Page 77: ...72 Outdoor Furnaces...
Page 79: ...74...