54
1) Remove the silicone from around the lift hook and relief vent pipe.
2) Remove all roof screws holding the damaged roof secure.
3) Lift the old roof steel off the furnace.
4) Install the new roof steel.
5) Secure the new roof to the frame of the furnace.
6) Re-seal the lift point and relief vent pipe with caulking.
Sides of the HEATMOR™
Principle of the Sides and Ends
The sides of the furnace are clad with black steel. The steel siding
provides a dry covering to protect the insulation of the furnace. The
left side of the furnace has an external hopper hook-up access door.
Maintenance / Result
Inspect the sides of the furnace once a year to verify that there is no
damage. Ensure there is a good seal so no water can enter into the
insulation covering the sides of the water jacket.
Removal and Replacement
If the sides have been damaged they can be replaced with new
paneled steel siding. Contact your local dealer.
Insulation
Principle of the Insulation
The insulation helps retain the heat in the water, which has been heated by
the fire. It also provides a heat barrier to ensure that the outer steel siding
does not resease any heat.
Maintenance / Result
It is important to keep the insulation dry. Wet insulation loses its R-Value.
Keep the base of the furnace sealed to prevent small rodents from making
nests or wrecking the insulation.
Removal and Replacement
To remove and replace the insulation, please contact your local dealer.
Side
Insulation
Summary of Contents for 200 SSP
Page 1: ...Outdoor Furnaces TM save these instructions...
Page 8: ...3 EPA PHASE 2 HANGTAG MODEL 200 SSP...
Page 9: ...4...
Page 10: ...5 HEATMOR Stainless Steel PELLET BURNER Outdoor Furnace Model Chapter 1 Model 200 SSP...
Page 77: ...72 Outdoor Furnaces...
Page 79: ...74...