F.  Horizontal Termination Requirements

Heat Shield Requirements for Horizontal 

Termination

WARNING!  Risk of Fire! 

To prevent overheating and 

fire,  heat  shields  must  extend  through  the  entire  wall 

thickness.

• 

DO NOT 

remove the heat shields attached to the 

wall shield firestop and the horizontal termination cap 

(shown in Figure 7.13).

•  Heat  shields  must  overlap  1-1/2  in.  (38  mm)  mini

-

mum.

There are two sections of the heat shield. One section 

is factory-attached to the wall shield firestop. The other 

section is factory-attached to the cap. See Figure 7.13.

If the wall thickness does not allow the required 1-1/2 in. 

(38 mm) heat shield overlap when installed, an extended 

heat shield must be used.

•  If  the  wall  thickness  is  less  than  4-3/8  in./  111  mm 

(SLP), the heat shields on the cap and wall shield 

firestop must be trimmed. A minimum 1-1/2 in. (38 mm) 

overlap MUST be maintained.

•  Use  an  extended  heat  shield  if  the  finished  wall 

thickness is greater than 7-1/4 in. (184 mm).

•  The extended heat shield may need to be cut to length 

maintaining  sufficient  length  for  a  1-1/2  in.  (38  mm) 

overlap between heat shields.

•  Attach  the  extended  heat  shield  to  either  of  the 

existing heat shields using the screws supplied with 

the extended heat shield.  Refer to vent components 

diagrams in the back of this manual.

•  Rest the small leg on the extended heat shield on top 

of the pipe section to properly space it from the pipe 

section.

Figure 7.13  Venting through the wall

Note: 

When using termination caps with factory-supplied 

heat shield attached, no additional wall shield firestop is 

required on the exterior side of a combustible wall.

Install Horizontal Termination Cap

WARNING! Risk of Fire! 

The telescoping flue section of 

the termination cap MUST be used when connecting vent.

•  1-1/2  (38  mm)  minimum  overlap  of  flue  telescoping 

section is required.

Failure to maintain overlap may cause overheating and 

fire.

•  Vent termination must not be recessed in the wall. Siding 

may be brought to the edge of the cap base. 

•  Flash  and  seal  as  appropriate  for  siding  material  at 

outside edges of cap.

•  When  installing  a  horizontal  termination  cap,  follow 

the cap location guidelines as prescribed by current 

ANSI Z223.1

 and 

CAN/CGA-B149

 installation codes 

and refer to Section 4 of this manual.

CAUTION! Risk of Burns! 

Local codes may require in-

stallation of a cap shield to prevent anything or anyone 

from touching the hot cap.

NOTICE: 

For certain exposures which require superior 

resistance to wind-driven rain penetration, a flashing kit and 

HRC caps are available.  When penetrating a brick wall, a 

brick extension kit is available for framing the brick.

INTERIOR

HEAT SHIELD OR

EXTENDED

HEAT SHIELD

WALL SHIELD

FIRESTOP

HEAT SHIELD

1-1/2 IN. (38 MM) MIN.

OVERLAP

SHEATHING

VENT DEPTH FROM BACK 

OF APPLIANCE OUTER WRAP

 TO OUTSIDE SURFACE

 OF EXTERIOR WALL

(SEE CHART BELOW)

SLIP SECTION

CAN BE EXTENDED

EXTERIOR

WALL

OUTER WRAP

Termination Cap Specification Chart

(Depth without using additional pipe sections)

SLP-TRAP1 can adjust 2-3/8 in. (4-1/8 in. to 6-1/2 in.)
SLP-TRAP2 can adjust 4-1/2 in. (6-1/2 in. to 11 in)

Summary of Contents for REVO-H31

Page 1: ...H Series in Canada This appliance is only for use with the type s of gas indicated on the rating plate This appliance is not convertible for use with other gases unless a certified kit is used DO NOT store or use gasoline or other flam mable vapors and liquids in the vicinity of this or any other appliance What to do if you smell gas DO NOT try to light any appliance DO NOT touch any electrical sw...

Page 2: ... 5 Vent Clearances and Framing A Pipe Clearances to Combustibles 27 B Wall Penetration Framing Firestops 27 C Ceiling Firestop Floor Penetration Framing 28 D Install Attic Insulation Shield 28 6 Appliance Preparation A Vent Collar Preparation Sealing the Firestop 29 B Install Appliance Corrugated Template On Wall Installation 30 C Install Appliance Outer Wrap On Wall Installation 33 D Install Appl...

Page 3: ... Installation only Section 11 ___________________________ Electrical Section 8 Pg 42 43 120VAC unswitched power provided to the appliance ___________________________ Veri ed ON OFF switch wires properly installed ___________________________ Gas Section 9 Pg 44 45 Appliance con guration matches fuel type ___________________________ Was a conversion performed ___________________________ Leak check p...

Page 4: ...pplemen tal room heat or as a decorative appliance It should not be factored as primary heat in residential heating calculations D High Altitude Installations NOTICE If the heating value of the gas has been reduced these rules do not apply Check with your local gas utility or authorities having jurisdiction When installing above 2000 feet elevation In the USA Reduce input rate 4 for each 1000 feet...

Page 5: ...ted gas fu eled heating appliance or equipment The sign shall read in print size no less than one half 1 2 in in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OB STRUCTIONS Inspection The state or local gas inspector of the side wall horizon tally vented gas fueled equipment shall not approve the installation unless upon inspection the inspector ob serves carbon monoxide detectors and signage ins...

Page 6: ...liance dry B Tools and Supplies Needed Before beginning the installation be sure that the following tools and building supplies are available Tape measure Framing material Pliers Hammer Phillips screwdriver Manometer Gloves Framing square Voltmeter Tin Snips Plumb line Safety glasses Level Reciprocating saw Stud Finder Flat blade screwdriver Electric drill 1 2 in bit 1 4 in masonry bit masonry wal...

Page 7: ... REVO can hang on a sheet rock combustible wall See Sections 3 6 and 10 for On Wall installation information The REVO can be partially recess into a wall using the In Wall Kit See Service Parts section in Owner s Manual and contact your dealer to order See Section 11 for installation information FRAMING FRAMING SHEETROCK MATERIAL CAN BE COMBUSTIBLE I E SHEETROCK FRAMING SHEETROCK APPLIANCE OUTER W...

Page 8: ...ions are actual appliance dimensions Use for reference only For framing dimensions and clearances refer to Section 3 and Section 5 Appliance Dimensions Table Figure 3 1 Appliance Dimensions Revo V12 Location Inches Millimeters A 36 1 8 918 B 12 305 C 24 610 D 16 5 8 422 E 19 1 4 489 F 6 1 8 156 G 28 1 2 724 H 9 5 8 245 I 6 5 8 168 J 3 76 K 4 1 4 108 L 6 3 8 162 M 7 7 8 200 REVO V12 ...

Page 9: ...ure 3 2 Appliance Dimensions Revo S21 C B G A E D H F M L I K J Location Inches Millimeters A 33 5 8 854 B 21 1 8 537 C 21 3 8 543 D 25 3 4 654 E 28 1 2 724 F 6 1 4 159 G 26 660 H 14 1 4 362 I 6 5 8 168 J 3 76 K 4 5 16 109 L 6 3 8 162 M 7 7 8 200 Appliance Dimensions Table REVO S21 ...

Page 10: ...Figure 3 3 Appliance Dimensions Revo H31 C B G A E D H F M L I K J Appliance Dimensions Table Location Inches Millimeters A 29 1 8 740 B 31 787 C 17 432 D 35 5 8 905 E 38 1 4 972 F 6 1 8 156 G 21 1 2 546 H 19 1 8 486 I 6 5 8 168 J 3 76 K 4 3 16 106 L 6 3 8 162 M 7 7 8 200 REVO H31 ...

Page 11: ...Frame Decorative Fronts Figure 3 5 Appliance Dimensions Radius Decorative Front RADIUS DECORATIVE FRONT 32 3 4 IN 34 1 8 IN 23 1 2 IN 37 15 16 IN REVO V12 42 9 16 IN 30 3 16 IN REVO S21 REVO H31 36 5 8 IN 36 15 16 IN 46 15 16 IN 32 11 16 IN 27 5 8 IN 39 1 2 IN REVO V12 REVO S21 REVO H31 See Section 10 A 10 B 10 C and 11 C for facing and finishing detail ...

Page 12: ...nce and vent pipe Insulation and other materials must be secured to prevent accidental contact The chase must be properly blocked to prevent blown insulation or other combustibles from entering and making contact with fireplace or chimney Failure to maintain airspace may cause overheating and a fire See Figure 3 6 3 7 3 8 3 9 and 3 11 for framing dimension requirements and required clearances 41 I...

Page 13: ...afts the wall shield and ceiling fire stops should be caulked with caulk with a minimum of 300ºF continuous exposure rating to seal gaps Gas line holes and other openings should be caulked with caulk with a minimum of 300ºF continuous exposure rating or stuffed with unfaced insulation If the appliance is being installed on a cement surface a layer of plywood may be placed underneath to prevent con...

Page 14: ...6 mm 257 559 102 0 0 305 914 Revo H31 in 10 1 8 22 4 0 0 12 36 mm 257 559 102 0 0 305 914 D Clearance to combustible floor not required due to 4 inch minimum on Dimension C E The appliance outer wrap can attach directly to combustible material i e sheetrock F See Section 10 D and 10 E for combustible and non combustible mantel legs A CUT OUT MATERIAL FOR VENT PIPE C D F B TO CEILING E APPLIANCE OU...

Page 15: ...ation regarding ceiling firestop Figure 3 11 Ceiling Penetration Framing Requirements Figure 3 9 Clearance Requirements 1 5 8 IN CUT LINE NOTE The firestop heat shield will need to be cut when using an elbow directly off the back of the appliance See Figure 3 9 Figure 3 10 Wall Firestop Clearances CLEAR SPACE 3 FT IN FRONT OF FIREPLACE MESH 4 IN MIN TO FINISHED FLOOR FLOOR CAN BE COMBUSTIBLE Figur...

Page 16: ... INCHES MIN H MIN MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING 4 Termination Location and Vent Information Fire Risk Maintain vent clearance to combustibles as specified DO NOT pack air space with insulation or other materials Failure to keep insulation or other materials away from vent pipe may cause overheating and fire WARNING Figure 4 2 Staggered Termination Caps Gas Wood or Fuel Oil T...

Page 17: ...k or a paved driveway A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings N 6 inches non vinyl sidewalls 12 inches vinyl sidewalls O 18 inches non vinyl soffit and overhang 42 inches vinyl soffit and overhang P 8 ft QMIN RMAX 1 cap 3 feet 2 x Q ACTUAL 2 caps 6 feet 1 x Q ACTUAL 3 caps 9 feet 2 3 x Q A...

Page 18: ...for the vertical aspect and the run for the horizontal aspect See Figure 4 4 Two 45º elbows may be used in place of one 90º elbow On 45º runs one foot of diagonal is equal to 8 1 2 in 216 mm horizontal run and 8 1 2 in 216 mm vertical run A length of straight pipe is allowed between two 45º elbows See Figure 4 4 Figure 4 5 shows the vertical and horizontal offsets for SLP elbows Figure 4 4 HORIZON...

Page 19: ...elbows can be replaced with two 45º elbows SUBTRACT 3 ft from the total H measurement for each 90º elbow installed horizontally SUBTRACT 1 1 2 ft from the total H measurement for each 45º elbow installed horizontally A maximum of three 90º elbows or six 45º elbows may be used in any vent configuration Some elbows may be installed horizontally See Figure 4 9 and Figure 4 12 When penetrating a combu...

Page 20: ...2273 980 Rev J 5 15 20 Figure 4 6 Figure 4 7 Horizontal Termination No Elbow One 45º Elbow H 12 in 305 mm Maximum H Maximum V12 12 in 305 mm S21 Not allowed H31 Not allowed H H Note This vent configuration is not allowed with the REVO S21 or REVO H31 models ...

Page 21: ... m 6 ft 1 8 m 14 ft 4 3 m 7 ft 2 1 m 14 ft 4 3 m V1 H1 H2 40 ft 12 2 m Maximum HTotal REVO S21 REVO H31 14 ft 4 3 m Maximum REVO V12 12 ft 3 7 m Maximum V1 Minimum H1 H2 H3 Maximum 1 ft 305 mm 2 ft 610 mm 2 ft 610 mm 5 ft 1 5 m 3 ft 914 mm 8 ft 2 4 m 4 ft 1 2 m 11 ft 3 4 m 5 ft 1 5 m 14 ft 4 3 m 6 ft 1 8 m 14 ft 4 3 m 7 ft 2 1 m 14 ft 4 3 m V1 H1 H2 H3 40 ft 12 2 m Maximum V1 1 ft 305 mm Minimum H...

Page 22: ... 3 m 7 ft 2 1 m 14 ft 4 3 m V1 H1 40 ft 12 2 m Maximum V1 2 ft 610 mm Minimum HTotal REVO S21 REVO H31 14 ft 4 3 m Maximum REVO V12 12 ft 3 7 m Maximum H1 V1 H1 V1 H2 V1 Minimum H1 H2 Maximum 2 ft 610 mm 4 ft 1 2 m 3 ft 914 mm 7 ft 2 1 m 4 ft 1 2 m 10 ft 3 0 m 5 ft 1 5 m 13 ft 4 0 m 6 ft 1 8 m 14 ft 4 3 m 7 ft 2 1 m 14 ft 4 3 m 8 ft 2 4 m 14 ft 4 3 m V1 H1 H2 40 ft 12 2 m Maximum V1 2 ft 610 mm Mi...

Page 23: ... Three Elbows V1 Minimum H1 H2 Maximum 2 ft 610 mm 6 ft 1 8 m 3 ft 914 mm 9 ft 2 7 m 4 ft 1 4 m 12 ft 3 6 m 5 ft 1 5 m 14 ft 4 3 m 6 ft 1 8 m 14 ft 4 3 m 7 ft 2 1 m 14 ft 4 3 m V1 V2 H1 H2 40 ft 12 2 m Maximum VTotal 2 ft 610 mm Minimum HTotal REVO S21 REVO H31 14 ft 4 3 m Maximum REVO V12 12 ft 3 7 m Maximum Figure 4 12 ...

Page 24: ...tion is 10 feet or greater See the chart in Figure 4 14 to determine the correct setting for the application being installed Closing the air shutter and baffle will improve the flame height if the vent configura tion involves a significant amount of vertical venting If the baffle is closed too far pilot starvation and or sooting may occur Ensure the baffle screw s is are secure once the adjustment...

Page 25: ...cap WARNING Risk of Fire Coaxial to colinear venting con figuration may only be used in existing non combustible chimney Installation in any other venting application could cause fire Prior to installing the gas appliance Have the chimney and adjacent structure inspected and cleaned by qualified professionals Hearth Home Technologies recommends that NFI or CSIA certified professionals or technicia...

Page 26: ...re 4 18 Connecting the LINK DV30B to the DV 46DVA GCL adapter Insert the two sections of flexible vent pipe down the existing chimney Attach one section of stainless steel flex pipe to the exhaust collar on top of the DV 46DVA GCL adapter with three screws Attach one section of flexible vent pipe to the stainless steel flex pipe with three self tapping screws Attach one section of flexible vent pi...

Page 27: ...han 4 3 8 the existing heat shields must be field trimmed If wall thickness is greater than 7 5 8 in a DVP HSM B will be required SLP Pipe Shown 3 in 76 mm top clearance 1 in 25 mm clearance bottom sides Heat Shield Wall Shield Firestop Heat Shield WALL 10 3 16 iN 12 IN C B DO NOT PACK WITH INSULATION OR OTHER MATERIAL A FINISHED FLOOR A B C Revo V12 in 4 in min 102 mm 28 1 2 C A B 1 in 1 in 25 mm...

Page 28: ...ipe to prevent overheating Figure 5 3 Installing Ceiling Firestop Figure 5 4 Installing the Attic Shield INSTALL ATTIC INSULATION SHIELDS BEFORE OR AFTER INSTALLATION OF VENT SYSTEM CEILING FIRESTOP INSTALLED BELOW CEILING CEILING FIRESTOP INSTALLED ABOVE CEILING PIPE SLP A 9 in 229 mm ATTIC ABOVE A A D Install Attic Insulation Shield WARNING Fire Risk DO NOT allow loose materials or insulation to...

Page 29: ... on the interior and exterior by caulk ing around the perimeter using caulk with a 300ºF minimum continuous exposure rating See Figure 6 1 and 6 2 WARNING Risk of Fire or Explosion DO NOT break caulk seals on slip sections Use care when removing termination cap from slip pipe If slip section seals are broken during removal of the termination cap vent may leak Figure 6 1 Firestop Exterior View CAUL...

Page 30: ... staples tacks or screws 3 Bring electrical and gas hookups to locations desig nated by markings on corrugated template Note Hard piped gas connections must be terminated with a specific Z dimension depth See references to Z dimension in Figure 6 3 Terminating the Hard piped gas connection with the proper Z dimension will simplify the process of connecting the gas to the appliance VENT ACCESS GLAS...

Page 31: ...6 IN 1 1 4 IN 3 IN 2 3 16 IN 2 1 4 IN 2 1 4 IN 3 1 2 IN 1 3 8 IN 6 3 16 IN 24 IN 12 IN 3 7 8 IN 7 16 IN 7 16 IN 10 3 16 IN 3 IN 6 3 16 IN 7 16 IN 1 5 16 IN 5 9 16 IN 3 IN 3 3 16 IN 10 3 16 IN 10 3 16 IN 21 3 8 IN 28 7 16 IN 21 1 8 IN 1 3 8 IN 33 5 8 IN 2 1 4 IN 2 3 16 IN 3 1 2 IN 3 IN GAS ACCESS LOCATION ELECTRICAL ACCESS LOCATION VENT GLASS VIEWING AREA GAS ACCESS LOCATION ELECTRICAL ACCESS LOCAT...

Page 32: ...2 REVO H31 29 3 16 IN 3 IN 3 1 2 IN 6 1 16 IN 17 IN 2 1 4 IN 2 3 16 IN 10 7 16 IN 3 IN 1 3 16 IN 10 3 16 IN 10 3 16 IN 1 3 8 IN 3 3 16 IN 7 16 IN 38 5 16 IN 31 IN Figure 6 7 Corrugated Template Dimensions H31 GAS ACCESS LOCATION ELECTRICAL ACCESS LOCATION VENT GLASS VIEWING AREA ...

Page 33: ...on the wall and ensure it is level See Figure 6 9 A minimum of two screws must be attached to the vertical wall studs Secure with the fasteners provided See Figure 6 11 C and Figure 6 12 CAUTION Outer wrap and appliance MUST be in stalled level for proper burner operation DO NOT REMOVE SCREW BOTH SIDES NOTE The REVO V12 has 4 screws on each side of the firebox FIREBOX COMPONENT TRAY DO NOT GRAB AP...

Page 34: ...al wall studs Figure 6 11 Masonry Anchors and Sheet Rock Anchors A MASONRY ANCHORS B SHEET ROCK ANCHORS ANCHOR 2 ASSEMBLED WASHER 2 C ATTACHMENT SCREWS 12 8 When attaching to a brick masonry wall use masonry anchors See Figure 6 11 A 9 A minimum of two screws must be used to attach the appliance to vertical wall studs See Figure 6 11 C Use sheet rock anchors if a wall stud is not available on eith...

Page 35: ...lift or carry the appliance by the top heat shield or com ponent tray See Figure 6 13 The process of mating the tabs and notches accommodates the alignment of the screws with the corresponding holes The tabs on the outer wrap should be bent outward as shown in Figure 6 13 Reinstall screws using Figure 6 8 as a reference Figure 6 13 Install Firebox On Appliance Outer Wrap TAB LOCATION TAB AND NOTCH...

Page 36: ...ercial Multi family Multi level exceeding two sto ries or High Rise Applications For Installation into a commercial multi family multi level exceeding two stories or high rise applications All outer pipe joints must be sealed with high temperature silicone 300ºF minimum continuous exposure rating including the slip section that connects directly to the horizontal ter mination cap Apply a bead of s...

Page 37: ... in Assembling Pipe Sections NOTICE If slip section is too long the inner and outer flues of the slip section can be cut to the desired length Maintain a 1 1 2 in 38 mm overlap between the slip section and the pipe section Secure the pipe and slip section with two screws no longer than 1 2 in 13 mm using the pilot holes in the slip section See Figure 7 4 C Secure the Vent Sections Vertical runs or...

Page 38: ... 15 38 D Disassemble Vent Sections Rotate either section see Figure 7 7 so the seams on both pipe sections are aligned as shown in Figure 7 8 Pull carefully to separate the pieces of pipe Figure 7 8 Align and Disassemble Vent Sections Figure 7 7 Rotate Seams for Disassembly ...

Page 39: ...GE OPENING 2 FT MIN 20 INCHES MIN H MIN MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING NOTICE Failure to properly caulk the roof flashing and pipe seams may permit entry of water Caulk the gap between the roof flashing and the outside diameter of the pipe Caulk the perimeter of the flashing where it contacts the roof surface See Figure 7 10 Caulk the overlap seam of any exposed pipe sections...

Page 40: ...er collar of the cap into the inner flue of the pipe section while placing the outer collar of the cap over the outer flue of the pipe section Secure the cap by driving three self tapping screws supplied through the pilot holes in the outer collar of the cap into the outer flue of the pipe see Figure 7 12 Termination Cap 1 of 3 Storm Collar Caulk Screws Figure 7 12 ...

Page 41: ... to properly space it from the pipe section Figure 7 13 Venting through the wall Note When using termination caps with factory supplied heat shield attached no additional wall shield firestop is required on the exterior side of a combustible wall Install Horizontal Termination Cap WARNING Risk of Fire The telescoping flue section of the termination cap MUST be used when connecting vent 1 1 2 38 mm...

Page 42: ...mostat and or a remote control Wiring for optional Hearth Home Technologies approved accessories should be done now to avoid reconstruction Follow instructions that come with those accessories 8 Electrical Information Figure 8 1 Junction Box Detail NOTICE DO NOT wire 110 120 VAC to wall switch Junction Box Installation If the box is being wired from the INSIDE of the appliance Remove the screw att...

Page 43: ...tion box to 110 120 VAC for proper operation of the appliance WARNING Risk of Shock or Explosion DO NOT wire IPI controlled appliance junction box to a switched circuit Incorrect wiring will override IPI safety lockout Refer to Figure 8 2 IPI Wiring Diagram This appliance is equipped with an IntelliFire Plus control valve which operates on a 6 volt 1 5AMP system Figure 8 2 IntelliFire Plus Ignitio...

Page 44: ...ittings and connections could have loos ened during shipping and handling WARNING Risk of Fire DO NOT change valve settings This valve has been preset at the factory WARNING Risk of Fire or Explosion High pressure will damage valve Low pressure may cause explosion Verify inlet pressures Verify minimum pressures when other household gas appliances are operating Install regulator upstream of valve i...

Page 45: ...lame appearance The shutter set tings will vary due to fuel type and vent configuration See Figure 9 1 To open the air shutter turn the screw counterclockwise so that the screw goes in and raises the air shutter Turn ing the screw clockwise will close the air shutter Note The air shutter is shipped set between 3 8 in and full open Adjust shutter to maximize flame appearance NOTICE If sooting occur...

Page 46: ...ishing strip to achieve required clearance See Figure 10 2 and 10 3 WARNING Risk of Fire DO NOT apply combustible materials beyond the minimum clearances Comply with all minimum clearances to combustibles as specified in this manual Overlapping materials could ignite and will interfere with proper operation of doors Figure 10 1 Convection Vent Location WARNING Risk of Overheating and Fire Do not a...

Page 47: ... APPLIANCE WALL UNBLOCKED CONVECTION VENTS Figure 10 3 Non Combustible Facing Diagram SHEET ROCK NON COMBUSTIBLE MATERIAL APPLIANCE 4 IN MAX THICKNESS ALL 4 SIDES 1 2 IN CLEARANCE TOP ONLY 0 IN CLEARANCE BOTTOM AND SIDES NOTE MEASURE CLEARANCES FROM APPLIANCE OUTER WRAP WALL USE FINISHING STRIP TO ACHIEVE CLEARANCE ...

Page 48: ... 6 Radius Door Side View WALL SHEET ROCK NON COMBUSTIBLE FINISH MATERIAL 1 IN THICK MAX OUTER WRAP RADIUS DOOR Figure 10 7 Radius Door Non Combustible Facing Diagram The following instructions apply to facing and finishing materials up to one inch thick made of non combustible material finished up to the appliance outer wrap and used with the Radius decorative front For the definition of non combu...

Page 49: ...49 Heat Glo REVO V12 REVO S21 REVO H31 Installation Manual 2273 980 Rev J 5 15 ZERO CLEARANCE TO OUTER WRAP ALL 4 SIDES RADIUS DOOR Figure 10 8 Radius Door Installed Front View ...

Page 50: ... around the decorative front is needed for removing and installing the Radius decorative front Figure 10 11 Radius Door 1 2 IN 1 2 IN NON COMBUSTIBLE FINISH MATERIAL CLEARANCE TO RADIUS DOOR 1 2 IN 1 2 IN The gap around the decorative front is needed for removing and installing the Radius decorative front Figure 10 12 Radius Door Clearance to Non Combustible Finishing Material REMOVE CLIPS FINISHI...

Page 51: ...980 Rev J 5 15 Figure 10 13 Radius Door Clearance to Appliance Outer Wrap NON COMBUSTIBLE FINISH MATERIAL CLEARANCE TO APPLIANCE OUTER WRAP TOP SIDES BOTTOM TOP SIDES BOTTOM V12 1 7 8 IN 2 5 8 IN 1 1 8 IN S21 1 1 8 IN 2 5 8 IN 9 16 IN H31 1 3 8 IN 2 5 8 IN 13 16 IN ...

Page 52: ...as specified Framing closer than the minimums list ed must be constructed entirely of non combustible materi als i e steel studs concrete board etc Figure 10 14 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles Note All measurements in inches MEASUREMENTS FROM TOP OF APPLIANCE OUTER WRAP 15 IN MIN 18 IN MIN 22 IN MIN TO CEILING APPLIANCE OUTER WRAP 12 IN MAX 6 IN MAX 12 IN MIN 9 I...

Page 53: ...OR PERPENDICULAR WALL STUDIO AND FRAME DOORS ONLY DRYWALL MOUNTED FLUSH WITH WALL TOP OF APPLIANCE OUTER WRAP 1 4 IN 4 IN 12 IN 305 MM MIN UNLIMITED Figure 10 16 Combustible Mantel Leg or Wall Projections Acceptable on both sides of outer wrap Combustible Mantel Legs or Wall Projections Studio and Frame Fronts Figure 10 17 Non Combustible Mantel Leg or Wall Projections Acceptable on both sides of ...

Page 54: ...liance FRAMING DIMENSIONS A B C V12 20 1 8 in 43 1 8 in 4 in min S21 29 3 8 in 40 1 2 in 4 in min H31 39 3 8 in 39 in 4 in min Figure 11 1 Framing Dimensions and In Wall Tub Clearances The Revo may be installed recessed into the wall using the In Wall Tub The Frame and Studio doors are com patible with this type of installation In Wall installation is not compatible with the Radius decorative fron...

Page 55: ...LED TOP VIEW GAS ACCESS ELECTRICAL ACCESS 2 IN CORRUGATED TEMPLATE FLUSH WITH BOTTOM STUD AND CENTERED LEFT TO RIGHT BETWEEN VERTICAL STUDS BLOCKS NOTE USE BLOCKS TO ACHIEVE 2 INCH DEPTH FOR POSITION OF CORRUGATED TEMPLATE Z DIMENSION OPTIMAL HARD PIPED GAS DEPTH 1 3 IN Z 1 3 IN GAS ACCESS ELECTRICAL ACCESS BOTTOM STUD VERTICAL STUDS HARD PIPED GAS CONNECTION TERMINATION ...

Page 56: ...ED FLOOR INSULATION INSTALLED APPLIANCE INSTALLED OUTER WRAP INSTALLED HOLES FOR ATTACHING OUTER WRAP 4 IN TO FINISHED FLOOR TUB ASSEMBLY INSTALLED NON COMBUSTIBLE BOARD NON COMBUSTIBLE BOARD NON COMBUSTIBLE BOARD CORRUGATED TEMPLATE GAS ACCESS ELECTRICAL ACCESS NOTE REMOVE CORRUGATED TEMPLATE BEFORE INSTALLING INSULATION FINISHED FLOOR A B C D E F G H I SCREWS SCREWS SCREWS NOTE INSTALL SCREWS RE...

Page 57: ...sembly from the firebox by re leasing the two top glass latches and then the two bottom glass latches See Figure 12 1 9 Remove firebox from outer wrap See Figure 6 8 10 Install the outer wrap as shown in Figure 3 F G using the four supplied bolts in the threaded holes Additional screws may be installed to ensure the tub and the outer wrap are secured flat to one another 11 Frame around the edges o...

Page 58: ...MBUSTIBLE BOARD Figure 11 7 In Wall Tub Installation Sheet Rock Facing B In Wall Minimum Combustible Facing Clearances 1 2 IN MAX THICKNESS Figure 11 8 In Wall Tub Installation Sheet Rock Thickness NOTICE The In Wall application is not compatible with the Radius decorative front HOOD CLIP DETAIL FINISHING STRIPS PROPER INSTALLATION OF HOOD CLIPS VIEW SHOWN WITHOUT FINISHING STRIPS VIEW SHOWN WITH ...

Page 59: ... MAINTAIN PROPER CLEARANCE SEE FIGURE 11 5 FOR INSTALLATION SHEET ROCK 1 2 IN MAX THICKNESS REMOVE CLIPS APPLIANCE FINISHING STRIP REMOVE APPLIANCE FINISHING STRIP NOT USED WITH IN WALL KIT NON COMBUSTIBLE BOARD NON COMBUSTIBLE FACING STUDIO OR FRAME DECORATIVE FRONT SHEET ROCK 1 1 2 IN THICK MAX NOTE FINISHING STRIPS CAN BE USED TO MAINTAIN PROPER CLEARANCE SEE FIGURE 11 5 FOR INSTALLATION DO NOT...

Page 60: ...EETROCK COMBUSTIBLE FACING MATERIAL 6 IN MIN FROM IN WALL TUB OPENING UNLIMITED TUB SHEETROCK COMBUSTIBLE FACING MATERIAL 1 2 IN MAX Figure 11 13 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles Note All measurements in inches MEASUREMENTS FROM TOP OF APPLIANCE OUTER WRAP 15 IN MIN 18 IN MIN 22 IN MIN TO CEILING APPLIANCE OUTER WRAP 6 IN MAX 3 IN MAX SHEETROCK 1 2 IN MAX THICKNES...

Page 61: ...moved before appliance is fired WARNING Risk of Fire Close the ball valve before in stalling the splatter guard to prevent accidental lighting Remove the splatter guard before lighting the appliance 1 Install the splatter guard in the space between the tub and the top and sides of the appliance outer wrap See Figure 11 15 2 To gain access to the component tray lift the flap on the splatter guard a...

Page 62: ... by Hearth Home Technologies Unapproved doors or fronts may cause fireplace to overheat This fireplace has been supplied with an integral barrier to prevent direct contact with the fixed glass panel DO NOT operate the fireplace with the barrier removed Contact your dealer or Hearth Home Technologies if the barrier is not present or help is needed to properly install one For more information refer ...

Page 63: ... 45 Elbow SLP90 90 Elbow Effective Height Length SLP PIPE SLP HVS Horizontal Pipe Support SLP FS Ceiling Firestop SLP WS Wall Shield Firestop 10 7 8 in 276 mm 8 7 8 in 225 mm 1 1 2 in 38 mm 8 11 16 in 220 mm 8 11 16 in 220 mm 1 1 2 in 38 mm 12 in 305 mm 12 in 305 mm 5 1 2 in 146 mm Effective Height Length Pipe inches mm SLP4 4 102 SLP6 6 152 SLP12 12 305 SLP24 24 610 SLP36 36 914 SLP48 48 1219 SLP...

Page 64: ...ned to be used on a wall 4 in to 7 1 4 in 102 mm to 184 mm thick If wall thickness is less than 4 in 102 mm the existing heat shields must be field trimmed If wall thickness is greater than 7 1 4 in 184 mm a DVP HSM B will be required Heat Shield Term Cap Minimum Effective Length Maximum Effective Length Trap1 3 1 8 in 4 3 4 in 79 mm 121mm Trap2 5 1 4 in 9 1 4 in 133 mm 235 mm 8 in 203 mm 12 in 30...

Page 65: ...X TRAP Horizontal Termination Kit 14 in 356 mm 14 1 16 in 357 mm 7 1 2 in 192 mm 10 3 4 in 273 mm SLP CCS BK Cathedral Ceiling Support Box Black SLP DCF BK Ceiling Firestop Black SLK SNKD Snorkel Termination Cap SLP TVHW Vertical Termination Cap DVP FBHT Horizontal Termination Cap 13 1 2 in 343 mm 28 1 2 in 724 mm 10 11 16 in 271mm 17 7 8 IN 454 mm 7 3 8 IN 187 mm 14 IN 356 mm 12 IN 305 mm SLP TB1...

Page 66: ...the appliance and are ordered separately from PVI SLP Contact your dealer to order 12 1 2 IN 318 mm 20 3 4 IN 527 mm 13 5 8 IN 346 mm EFFECTIVE LENGTH 32 IN 813 mm MIN 35 IN 889 mm MAX A Vent Components Diagrams continued PVK 80 Not approved for use with REVO V12 11 1 2 in 292 mm 12 1 2 in 318 mm 16 in 406 mm 9 in 229 mm 2 3 4 in 70 mm 12 1 4 in 311 mm Note Vent runs including the PVK 80 or PVI SL...

Page 67: ...146 to 213 mm 5 1 2 in 140 mm 8 3 8 in 213 mm Figure 13 5 DVP vent components Fire Risk When using DVP HRC SS or DVP HRC ZC SS termination caps on top vented fireplaces a 6 inch minimum vertical vent section is required before installing first elbow WARNING LINK DV30B Flex Liner Kit DV 46DVA GCL Coaxial Colinear Appliance Connector 768 380A Stainless Steel Flex Pipe DVP 2SL Adapter COAXIAL to COLI...

Page 68: ...from PVLP SLP Contact your dealer to order Note The PVLP SLP requires a PVLP CK be installed on this appliance The PVLP CK is ordered separately from the PVLP SLP Contact your dealer to order Figure 13 6 PVLP SLP Vent Components PVLP HS Heat Shield 14 IN 356 mm 15 1 2 IN 394 mm 11 1 2 IN 292 mm 8 IN 203 mm 4 3 8 IN 112 mm 10 IN 254 mm 5 1 4 IN 135 mm 2 1 4 IN 57 mm 9 1 2 IN 241 mm 4 3 4 IN 121 mm ...

Page 69: ...ll a switch lock or a wall remote control with child protection lockout feature Keep remote controls out of reach of children See your dealer if you have questions Printed in U S A Copyright 2015 Heat Glo a brand of Hearth Home Technologies 7571 215th Street West Lakeville MN 55044 www heatnglo com Please contact your Heat Glo dealer with any questions or concerns For the location of your nearest ...

Reviews: