6
016-0171-655 Rev. E
37
CHASSIS CABLE INSTALLATION
HAWKEYE POWER CONNECTIONS (NO INJECTION)
1. Locate the three way fuse panel under the right-rear of the catwalk.
2. Place an 70 Amp AMI fuse (P/N 510-1003-048) in one of the two rear positions of the fuse panel.
FIGURE 3. Hawkeye Power Connection (No Injection)
NOTE:
If the system will include Sidekick Pro™ ICD injection, a secondary fuse panel is required. The injection
pumps and Hawkeye
®
will be powered via the secondary fuse panel. Refer to See “Sidekick Pro™ ICD
Installation” on page 43. for additional information.
3. Connect one the M8 x 1.25 output studs to the power supply.
AMI Fuse
Power
Connections
Summary of Contents for RG1300
Page 8: ...CHAPTER 1 4 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 20: ...CHAPTER 2 16 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 22: ...CHAPTER 3 18 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 32: ...CHAPTER 4 28 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 38: ...CHAPTER 5 34 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 43: ...016 0171 655 Rev E 39 CHASSIS CABLE INSTALLATION SYSTEM DIAGRAMS...
Page 50: ...APPENDIX A 46 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 54: ...APPENDIX B 50 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 58: ...Index 54 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...