C
HAPTER
6
36
Hawkeye® Installation Manual for RoGator C-Series RG900, RG1100, RG1300
CENTER RACK ROUTING AND BOOM CABLE CONNECTIONS
1. Route the round connectors labeled “left boom” and “right boom” toward the center rack of the machine.
2. Use the provided zip ties to secure the chassis cable to the undercarriage as necessary to avoid snagging the
cable during machine operation.
3. At the rear of the applicator tank, route the chassis cable so it follows the chemical supply lines underneath the
rear catwalk and through the center rack framework. Follow the supply lines to ensure adequate slack for
operating the center rack during field operations and when folding and unfolding the booms.
FIGURE 2. Chassis Cable Center Rack Routing
4. Use zip ties to secure the chassis cable to existing system lines to keep the cable from being damaged during
normal equipment operation.
5. Connect the left and right boom cables connectors at the center rack.
6. Use supplied zip ties to secure any excess cabling on the center rack framework.
7. When installation is complete, re-connect the battery disconnect switch before operating the equipment.
Chassis
Cable
Summary of Contents for RG1300
Page 8: ...CHAPTER 1 4 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 20: ...CHAPTER 2 16 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 22: ...CHAPTER 3 18 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 32: ...CHAPTER 4 28 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 38: ...CHAPTER 5 34 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 43: ...016 0171 655 Rev E 39 CHASSIS CABLE INSTALLATION SYSTEM DIAGRAMS...
Page 50: ...APPENDIX A 46 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 54: ...APPENDIX B 50 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 58: ...Index 54 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...