4
016-0171-655 Rev. E
23
NOZZLE CONTROL VALVE INSTALLATION
BUMPER INSTALLATION FOR C-SERIES MACHINES WITH PROSTOP-E VALVES AND WILGER NOZZLE BODIES
1. Locate the boom stops and remove the existing hardware. Keep the existing washers and nuts.
FIGURE 8. Boom Stop
2. Place two boom stop spacers (P/N 107-0172-609) behind the boom stop.
FIGURE 9. Installed Boom Spacers
3. Use the longer bolt provided in the kit (P/N 311-0070-014) and the original nuts and washers to secure the
boom stop and spacers.
Summary of Contents for RG1300
Page 8: ...CHAPTER 1 4 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 20: ...CHAPTER 2 16 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 22: ...CHAPTER 3 18 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 32: ...CHAPTER 4 28 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 38: ...CHAPTER 5 34 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 43: ...016 0171 655 Rev E 39 CHASSIS CABLE INSTALLATION SYSTEM DIAGRAMS...
Page 50: ...APPENDIX A 46 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 54: ...APPENDIX B 50 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 58: ...Index 54 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...