APPENDIX
A
016-0171-655 Rev. E
43
APPENDIX A
SIDEKICK PRO™ ICD
INSTALLATION
SIDEKICK PRO ICD CONNECTIONS TO PCB
Connecting the Sidekick Pro™ ICD pump to the Hawkeye system is done via CANBUS PCB located behind the
node enclosure on the right-hand side of the machine.
For machines that do not already have injection pumps, Raven cables P/N 115-0172-443 and P/N 115-0172-444 are
required. For systems that have Raven CAN Sidekick™ Pro pumps installed, simply follow the instructions below.
For systems with AGCONTROL, Sidekick Pro™ ICD pumps are installed and cables are connected.
1. Locate the PCB located on the above the axle on right-hand side of the machine.
FIGURE 1. Rear PCB Location
2. Remove the cover plate.
Summary of Contents for RG1300
Page 8: ...CHAPTER 1 4 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 20: ...CHAPTER 2 16 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 22: ...CHAPTER 3 18 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 32: ...CHAPTER 4 28 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 38: ...CHAPTER 5 34 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 43: ...016 0171 655 Rev E 39 CHASSIS CABLE INSTALLATION SYSTEM DIAGRAMS...
Page 50: ...APPENDIX A 46 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 54: ...APPENDIX B 50 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 58: ...Index 54 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...