16
Martin
®
ERA 150 Wash User Guide
power in a linked daisy-chain, POWER OUT throughput socket to POWER
IN input socket.
Using 12 AWG / 2.5 mm
2
cables from Martin, you can create a daisy chain
of linked fixtures that contains:
•
maximum four (4) ERA 150 Wash fixtures in total at 100-120 V, or
•
maximum seven (7) ERA 150 Wash fixtures in total at 200-240 V.
Summary of Contents for Martin ERA 150 Wash
Page 1: ...ERA 150 Wash User Guide ...
Page 46: ...46 Martin ERA 150 Wash User Guide Dimensions All dimensions are in millimeters ...
Page 51: ......
Page 52: ...www martin com ...