Chapter 3 – Installation
Hardy H6800 Series Application Controllers User Guide
32
Figure 3-4. Installing Four Screw Rods into the Front Panel Display
5. Place four washers followed by four nuts onto the rods. Tighten the four 4mm nuts to
completely and evenly compress the gasket to achieve an IP65 rating.
Note:
See I/I diagram for torque specification.
6. Install the display cable to the display as shown above.
7. Position the instrument enclosure with the display connector toward the panel.
8. Align the screw rods with the slots on the sides of the enclosure, then carefully slide the
instrument about half-way onto the rods.
9. Plug the display cable into the instrument taking care not to twist the cable.