![background image](http://html1.mh-extra.com/html/happ/27/27_installation-and-operation-manual_3753538015.webp)
Four post workshop lift HAPP27
Version 5
WWW.HAPP.COM.AU
14
Unpacking the hoist
The runways are fixed to the frames at top and bottom. Between these runways are the columns ,
pump assembly, cross beams , jacking beams, ramps and miscellaneous parts.
The beams and columns are heavy, ensure you place some protective board alongside the
package to protect floor and items, particularly for the cross beams.
Figure: Protective board to catch items dropping from packaging after straps is cut.
The smaller parts unpacked are listed below.