Four post workshop lift HAPP27
Version 5
WWW.HAPP.COM.AU
20
Figure: Threading cables in during assembly process ( cross beam is sitting on blocks, column not installed yet)
Once the main runway is in place with cables threaded, the runway is bolted to the cross beam.
Figure: bolts for connecting runway to cross beam.
The slave runway can now be lowered into position.