Inspect Site
54 - Prepare
Select Installation and Bursting Pit Locations
Consider the following when selecting pit locations:
Slope
Unit should be parked on a level site. Consider how slope will affect unit setup and operation. Assess the
risks on each slope to determine if factors affecting risks create an unsafe condition for pipe bursting.
Traffic
Vehicle and pedestrian traffic must be a safe distance from pulling equipment. Allow at least 10’ (3 m)
buffer zone around equipment.
Space
Check that starting and ending points allow enough space for installation and bursting pits. See “Dig
Check that installation area has enough space for product to be installed.
Check that there is enough space to work.
Access
Consider shade, wind, fumes, and other site features.
Summary of Contents for HG2200AT
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours...
Page 146: ......