57
Section 9
Maintenance
9.1 Schedule
The following table shows the recommended maintenance schedule for an average of 500
package analyses per week. This proposed schedule should be modified according to operating
conditions.
9.2 Purge gas cylinder
Check the purge gas cylinder (CO
2
99.9% purity) daily to ensure there is an adequate supply of
gas.
Action
Interval
Clean instrument exterior
Daily
Refill sonotrode base with water
Daily
Check piercing tip is tight
Daily
Check the purge gas pressure and purity
Daily
Run a reference sample (old beer) through the system to verify the
CO
2
sensor and the O
2
response/residual (< 20 ppb)
Daily
Goretex filter replacement (see
Weekly
Remove and clean instrument front door inside and out
Weekly
Clean optical barrier windows
Weekly
Clean the sonotrode surface of the package holder
Weekly
Clean laser optics used to position the package
Weekly
Refill the antifoam cartridge (see
Antifoam cartridge preparation on
Approximately every 6 weeks
O
2
sensor cartridge replacement and calibration (see
Every 2-3 months
Piercing gasket replacement (see
Every 3 months
Piercing tip replacement (see
)
Every 6 months
Clean antifoam cartridge
Every 6 months
Purge and clean antifoam system
Every 6 months
Replace the display protection film
Every 6 months
Replace the rim detector protection
Every 6 months
Replace flow chamber O-ring
Every 6 months
Replace the blue sample tubing
Every 6 months
The following are performed by a Hach Lange service technician
Sensor calibrations
Twice a year
Replace needle valve
Yearly
Replace antifoam cartridge internal membrane
Yearly
Antifoam pump maintenance
Yearly
Piercing module maintenance
Yearly
CAUTION
On no account should the cylinder become empty while the instrument is switched on, as this
can cause damage to the carbon dioxide sensor.
Summary of Contents for ORBISPHERE 6110
Page 1: ...DOC024 52 93009 ORBISPHERE Model 6110 Package Analyzer User Manual 08 2013 Edition 5 ...
Page 2: ......
Page 6: ...4 Table of Contents ...
Page 14: ...12 General Information ...
Page 16: ...14 Specifications 2 2 Instrument dimensions Figure 1 Instrument dimensions ...
Page 28: ...26 Installation ...
Page 34: ...32 User Interface and Startup 4 3 Menu structure overview ...
Page 35: ...33 Section 5 Configuration 5 1 Configuration menu overview ...
Page 46: ...44 Configuration ...
Page 56: ...54 Measurement ...
Page 58: ...56 Analysis ...
Page 70: ...68 Spare Parts and Accessories ...
Page 74: ...72 Material Safety Data Sheets MSDS ...
Page 75: ...73 ...