51
4.3 Wiring diagrams
Statuses of the lock contacts in the de-energised state
Statuses of the lock contacts in initial position
The initial position is defined as possible:
Operating voltage is applied
Door closed (latchbolt locked)
Lever handle not actuated
Door contact (TK) closed
If the door contact (TK) is not used, connect the contact “TK” (pin 01/brown-green) with the
connection “+24 V” (Pin 13/brown).
C
C
C
C
14 WH
13 BN
09 PK
01 BNGN
10 GY
06 BK
12 GN
08 BU
02 WHGN
04 GYPK
07 RD
11 YE
03 RDBU
05 VT
GND
+ 24 V
RS485 A
RS485 B
a)
b)
c)
d)
NO
NO
NO
NO
C
C
C
C
GND
+ 24 V
RS485 A
RS485 B
a)
b)
c)
d)
NC
NO
NO
NO
TK
24 V DC
230 V AC
14 WH
13 BN
09 PK
01 BNGN
10 GY
06 BK
12 GN
08 BU
02 WHGN
04 GYPK
07 RD
11 YE
03 RDBU
05 VT
5.
Start-up
After checking for compliance with the installation and operating instructions, carry out
commissioning with the following steps.
Before commissioning, ensure that the installation and operating conditions are fulfilled.
Switch on the power supply for the lock.
Perform a functional test.