Issue 07/2011
Page 66
Bu
ilt
-in g
en
er
at
or
s w
ith s
w
itch c
ab
in
et f
or p
er
m
an
en
tly i
ns
ta
lle
d p
ow
er g
en
er
at
io
n s
ys
te
m
s ≥ 1
2 k
VA i
n fi
re e
ng
in
es
Operation
Power generation system operation
Important
Risk of damage
y
When using several devices on the AC power sockets at
the same time (especially on devices with different power
consumption ratings), temporary over and undervoltages may
arise due to a switch-on delay in the neutral conductor.
►
Do not use the line circuit breakers in the switch cabinet for
switching the connected equipment on or off.
Important
y
The power generation system is not suitable for supplying
fixed distribution networks.
►
Do not use the power generation system to supply
building-site distribution boards or other fixed distribution
networks (e.g. domestic installations).
Always close the hinged covers on power sockets on the switch cabinet not
in use correctly.
When commissioning the power generation system and connecting
consumers, proceed as follows:
>
Carry out the every work day inspection of the insulation monitor.
ð
Section 5.5.4, page 70.
>
No devices are allowed to be connected to the power generation system.
Summary of Contents for DWG (BL) 13/7-2 ZE
Page 87: ...Page 87 Issue 07 2011...