GST-IFP8 Intelligent Fire Alarm Control Panel
Installation and Operation Manual
Page 8
Chapter 4 Installation
The steps below are guidance for installation of the FACP.
1
Check if you have received all items ordered.
2
Install the cabinet.
3
Power up the FACP and check if it can be normally started.
4
Connect peripheral devices.
5
Check the lines and register devices.
6
Define devices and C&E equations using GST-DEF software on a PC and
download them to the FACP through definition software according to
engineering configuration.
7
Check and commission peripheral devices.
4.1 Component Inspection
Before installation, check the following items:
Check Engineering Requirement
Check the packing list according to engineering requirement. The main items to be
examined are: installation and operation manual, key to the FACP, and etc.
Check Internal Components and Interconnection inside the FACP
All internal parts have been connected (including optional units ordered) before the
FACP leaves the factory. Therefore, you can mainly check the zone indication panel and
power supply, and the connection among parts, including the connection between
mother board and power supply, switch board and key board, the connection of the
zone indication panel with switch board, etc. Please refer to Appendix 1 for the internal
connection diagram.
4.2 Cabinet Installation
GST-IFP8 FACP is flushed mounted. Dimensions of the cabinet are shown in Fig. 4-1.
Ambient conditions for installation of the FACP:
Temperature: 0
℃
~+40
℃
Relative humidity:
≤
95
%
, non-condensing
Note: The knockout hole shall be fitted with cable junction to avoid abrasion of the cable
or foreign matters entering the FACP.
Summary of Contents for GST-IFP8
Page 1: ......