18
H5_30_Wide_HT_Roll_Up
Revision date: 06.28.19
Install End Frame
END FRAME ASSEMBLY
This building includes end wall framing. Brackets and hardware are included for assembly. Use these steps to install
the end wall framing and the supplied connecting hardware. Consult end frame diagrams in Quick Start section for
additional details.
NOTE:
Use recognized construction practices when setting the 2" x 2" square tube frame members. Using the
dimensions shown and a plumb bob (or similar tool), mark the four (4) vertical tube locations on the ground.
1. Dig 6" hole at each support location that is at least 24" deep to allow lower end of each tube to install below
finished grade. For best results, use a small power-driven auger.
2. Use the details in the Quick Start section and below to attach framing to the end rafter as shown.
3. Install the horizontal end frame tubes. Set the upper horizontal tube as high on the end wall columns as possible
to allow clearance for the roll-up door panel.
4. Ensure 2" x 2" posts are plumb and backfill holes. Use a wood post or similar tool to tamp the dirt tightly around
the posts.
ATTENTION:
For best results and to permanently secure end frame columns, use concrete to fill holes and allow
to set.
4'-0"
10'-0"
4'-0"
6'-0"
6'-0"
S20P03050G14
S20P12425G14
S20P118
S20P118
Ground Level
S20P03050G14
S20P14575G14
S20P12425G14
5. Repeat steps to install support posts and header for remaining end wall.
6. Continue by installing the end panel with roll-up door.
WARNING:
To prevent damage to cover and to prevent serious personal injury,
DO NOT attempt to install main cover or end panels on windy or stormy days.