4
H5_30_Wide_HT_Roll_Up
Revision date: 06.28.19
Baseboards and Ribbon Boards — Required
BASEBOARD (REQUIRED)
A customer-supplied baseboard is required.
Minimum baseboard dimensions: 2" x 6".
Use treated
lumber for best results if allowed.
Baseboard runs length of frame at ground level and helps
prevent ground posts from working loose when anchored.
Baseboards are supplied by customer; these are not
included. Fasteners (1/4" x 4" carriage bolts, washers,
and nuts) to secure baseboards to rafters
are included
.
RIBBON BOARD (REQUIRED)
A customer-supplied ribbon board (also known as a
hip board) is required to provide a mounting surface for
u-channel along each side.
Customer supplies materials
for ribbon board; fasteners to secure ribbon board
to frame are included. Recommended ribbon board
dimensions are shown below. Use treated lumber for
best results if allowed.
DIAGRAMS ARE NOT TO SCALE.
FA4652
Wood
Screw
1/4" x 4" Carriage Bolts
(FAH009B), 1/4" flat
washers (FAME50B, and
FALB01B 1/4" nuts.
2" x 6"
Ribbon Board
Ground
Level
Inside of
Shelter
Outside of
Shelter
Splice baseboard between
rafters as shown for best
results.
Ribbon boards run the frame length along
each side at top of sidewall opening.
Baseboards run the frame length at
ground level or slightly into grade.
Recommended ribbon board and
baseboard dimensions are 2" x 6".
Use treated lumber for best results if
allowed.
Ground Level
RAFTER
Customer-Supplied Baseboard
(1/4" fasteners included)
Customer-Supplied Ribbon Board
(1/4" fasteners included)
End View