30
H5_30_Wide_HT_Roll_Up
Revision date: 06.28.19
10. Trim excess cover material if desired.
ATTENTION:
Allow some material to remain. This
allows easier stretching of cover in the event material
expands after installation.
For the 120' long frame, repeat the steps to install the
remaining 62' panel.
11. Continue with installation of roll-up sides.
INSTALL MAIN COVER (continued)
Film (or 5.2 oz) Cover Installation
Step 8
102197 U-Channel
WEAR EYE PROTECTION
WHEN INSTALLING SPRING
WIRE!
Shows cover
secured to end
rafter u-channel.
ATTENTION:
Ensure enough cover material is
present to lock into end rafter u-channel. Typically,
cover material is cut longer/wider than required.
For easier anchoring, allow approximately 10" to
extend past edge of end rafter as cover is anchored.
Remove ropes after cover is secure.
6. Continue down both sides of the first rafter until main
cover is secured to u-channel.
7. Move to the free end, pull cover tight, and repeat
steps to secure cover in the u-channel.
8. After securing cover end-to-end, move to one side
and install 102198A spring in side u-channel.
NOTE:
Begin near middle of channel and work
toward each end. Maintain an even length working
along the side. Final stretching of cover takes place
when last side is secured.
9. Next, move to remaining side, stretch cover, and
secure in place. Pull cover tight and insert spring into
u-channel.