- 34 -
5. Rise the Media Set Lever of the CE7000-40.
6. Press the “2” button on the control panel of the CE7000-40.
Then the Tool Carriage will be moved between the left and right Push Rollers.
After that, the “READY” will be displayed on the control panel of the CE7000-40.
After Tool Carriage moving between the left and right Rush Rollers,
the “READY” will be displayed on the control panel.