Section 3 - Operation
3-34
80804002
3.15 RETURN TO TRAVEL MODE
Preparing Upperstructure for Undercarriage Operation
1. Check operation of brakes after remote operation and digging.
2. Position unit on level surface, apply digging brake and stop engine. Check the
following for damage; brake actuator chambers and rods, brake actuator
brackets, and slack adjusters. With brake applied, actuator rod should form an
approximate right angle with slack adjuster. Do not drive unit until any damage
or malfunction has been repaired. Check for proper slack adjuster operation in
accordance with the procedure shown on page 5-37.
3. Position boom over rear of undercarriage and embed bucket in ground or
against a solid object.
4. Apply down pressure with boom and pull and push with boom while a helper
watches for rotation of each wheel.
5. Rotation of any wheel during step 3 indicates brake failure on that wheel. Have
any failure corrected before driving the unit.
6. Position boom in rest, allowing clearance for attachment. See
on page 3-35. Secure boom using boom hold-down device. See
7. Idle engine to remove heat from critical areas.
8. Shut down engine from upperstructure cab.
9. Proceed to undercarriage cab.
Preparing Undercarriage for Conventional Operation
• See
Summary of Contents for XL3100IV
Page 6: ...Read This First d 80804002 NOTES...
Page 24: ...Section 1 General Safety Practices 1 14 80804002 NOTES...
Page 33: ...Section 2 Pre Operation and Controls 2 9 80804002 NOTES...
Page 53: ...Section 2 Pre Operation and Controls 2 29 80804002 NOTES...
Page 61: ...Section 2 Pre Operation and Controls 2 37 80804002 NOTES...
Page 79: ...Section 3 Operation 3 9 80804002 NOTES...
Page 108: ...Section 3 Operation 3 38 80804002 This Page Intentionally Left Blank...
Page 152: ...Section 5 Lubrication Maintenance 5 38 80804002 NOTES...
Page 164: ...Section 7 Specifications 7 10 80804002 This Page Intentionally Left Blank...