Setup
3A9099A Operation, Repair, Parts
17
7. Turn both Prime Valves to prime. Turn Pressure
Control counterclockwise to lowest pressure.
NOTE:
Minimum hose size allowable for proper
sprayer operation is 3/8 in. x 11 feet & 1/4 in. x 7 feet
for LLV 200MMA.
8. Start engine:
a. Move fuel valve to open.
b. Move choke to closed.
c. Set throttle to fast.
d. Set engine switch to ON.
e. Pull starter cord.
9. After engine starts, move choke to open.
10. Set throttle to desired setting.
11. Digital Display is functional after engine starts.
12. Mix BPO catalyst with component B per
manufacturer’s recommendation.
13. Place siphon tube in component B pail and drain
tube in separate waste pail.
ti28015a
ti27616a
ti27617a
ti27618a
ti28151a
ti27619a
ti27620a
ti27766a
ti27618a
ti28152a