![Graco 24T918 Instruction Manual Download Page 109](http://html1.mh-extra.com/html/graco/24t918/24t918_instruction-manual_2252663109.webp)
Accessories
333347F
109
4 Channel Upgrade Kit Installation
1.
Disconnect plug from power outlet or turn off circuit
breaker for incoming power.
2.
Place grounding wrist strap (1304) over your wrist
and secure other end to a grounded surface.
3.
Set the MZLP (1301) rotary switch to “2”.
4.
Remove screws (BB) then remove plate (AA) from
system.
5.
Use screws (BB) to install MZLP (1301) onto sys-
tem. Apply labels from label sheet (1308) to MZLP
#2. Place the “3” and “4” labels as shown in parts
illustration.
NOTE:
The new MZLP (1301) with be referred to as
MZLP 2, and the original MZLP that came with the sys-
tem will be referred to as MZLP 1 from here on. See F
65.
6.
Remove electrical enclosure front access door.
NOTE:
Do not force the electrical connection. Minimal
force is required to seat the connector. If resistance is
felt, stop and verify the connector orientation.
7.
Connect CAN jumper cable (1302) to MZLP 1 con-
nector J3 and connect other end of jumper
cable (1302) to MZLP 2 connector J3. See F
. 65.
8.
Connect power harness (1303) to MZLP 2 connec-
tor J2.
9.
Remove plugs (CC) from fluid manifold and replace
with straight fittings (1307) or the extra fittings
included with the InvisiPac system. Use the fittings
that meet your hose routing needs.
10. To ensure your InvisiPac system has the latest soft-
ware, insert token (1306) into ADM. Follow
, page 77.
F
IG
. 65
J3
J6
J5
J9
J8
J2
J1
J9
J5
J6
J3
J2
J8
J1
ti23596a
MZLP 1
MZLP 2
Step 7: Install Jumper Cable (1302).
Summary of Contents for 24T918
Page 16: ...Component Identification 16 333347F ...
Page 103: ...Accessories 333347F 103 ...
Page 129: ...Technical Data 333347F 129 ...