1: FASTEN THE SWING BEAM TO THE SWING BEAM BRACKET USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS ON
TOP OF THE SWING BEAM.
2: PLACE THE CHANNEL BRACKET UNDERNEATH THE SWING BEAM BRACKET.
3: FASTEN THE 3/8" LOCK NUTS WITH 3/8" WASHERS ONTO THE ENDS OF THE CARRIAGE BOLTS UNDERNEATH THE
CHANNEL BRACKET. PLACE A BOLT CAP OVER ANY EXPOSED THREADS.
4: PREDRILL AN 11/64" HOLE BY 2-1/2" DEEP IN THE CENTER CHANNEL BRACKET HOLE.
5: FASTEN A 3/8" X 3-1/2" LAG SCREW WITH 3/8" WASHER TO THE CHANNEL BRACKET IN THE CENTER HOLE.
STEP 26: MOUNT SWING BEAM TO SWING BEAM LEGS
BOLT CAP
CHANNEL BRACKET
(11-5018)
7" CARRIAGE BOLT
TORQUE WASHER
3/8" WASHER
3/8" LOCK NUT
3/8 X 3-1/2"
LAG SCREW
PREDRILL 11/64" HOLE
BY 2-1/2" DEEP
THROUGH THIS HOLE
INTO THE SWING BEAM.
62