A
STEP 29: ATTACHING THE SLIDE TO THE FORT
1: MEASURE FROM THE BOTTOM OF THE ROPE LADDER SUPPORT UP 87". MAKE A MARK ON THE LAG POSTS..
2: MEASURE UP 1-1/2" FROM THE BOTTOM CORNER HOLE IN THE SLIDE ENTRY AND DRILL A NEW 5/16" HOLE.
REPEAT THIS ON THE OTHER SIDE OF THE SLIDE ENTRY.
3: WITH THE HELP OF AN ASSISTANT PLACE THE SLIDE INTO POSITION AND LINE UP THE TOP WITH THE MARKS AT 87".
LOOK TO SEE IF THE FOOTER IS FLAT UPON THE GROUND. ADJUST THE SLIDE UP OR DOWN SLIGHTLY UNTIL THE
FOOT RESTS FLAT UPON THE GROUND.
3: FASTEN THE LOWEST HOLES AS SHOWN BELOW WITH A 2" LAG SCREW AND A 1-1/4" FENDER WASHER.
4: WORK YOUR WAY UP THE SIDES INSTALLING MORE 2" LAG SCREWSWITH 1-1/4" FENDER WASHERS.
5: NOW GO ALL AROUND THE SLIDE
AND TIGHTEN UP ALL OF THE BOLTS
IF YOU HAVE NOT DONE SO ALREADY.
SCALE 1 : 11
DETAIL A
B
DO NOT USE!
BOTH SIDES.
87" MARKS
1-1/4" FENDER WASHER
SCALE 2 : 11
DETAIL B
2" LAG SCREW
1 12 "
DRILL NEW 5/16" HOLE
(ON BOTH SIDES)
111