1: LOCATE TWO 96" CHAIN SECTIONS THAT SHIPPED WITH THE CLATTER BRIDGE.
2: PLACE THE CHAINS OVER THE HOLES IN THE BRIDGE DECK BOARDS AS SHOWN BELOW.
3: LINE UP THE 18TH LINK IN THE CHAINS WITH THE FIRST BRIDGE DECK BOARD HOLES.
STEP 17: BRIDGE DECK AND CHAIN ASSEMBLY
96" CHAIN SECTIONS
B
DETAIL B
SCALE 1 : 6
18TH CHAIN LINK
(LINE UP OVER HOLE
IN FIRST BRIDGE DECK
BOARD)
FIRST BRIDGE
DECK BOARD
99