Safety Guidelines………………………………………...............................……...Pages 3-6
Leveling Fort, General Information and Definitions……………………...............Pages 6-8
How to Install T-Nuts, Board Identification, Predrill Lag Screw Directions and
Swing Beam Loading........................................................................................Pages 9-13
Site Plan, Required Tool List and Kit Contents...............................................Pages 14-15
Hardware,Lumber and Accessory Checklist....………………………………....Pages 16-36
Adding T-Nuts to Corner Posts...…………………………………..………...…........... Step 1
Framing Fort……………………………………..…………………………..…....... Steps 2-10
Mounting Deck...............…………………………....……………….…………...….... Step 11
Rock Wall Assembly and Installation…..…………...…..……..……...….…….. Steps 12-16
Angle Support Installation.……………………..……........................................ Steps 17-18
Center Tarp Supports, Panel Slat and Tarp Board Installation....................... Steps 19-21
Swing Beam Assembly……….……………………..……..............................… Steps 22-29
Tarp Installation.……...……………………….……….............................................. Step 30
Hanging Swings, Safety Board…………………………………............…........ Steps 31-32
Picnic Table Assembly and Installation...……………………………......…....... Steps 33-35
Wave Slide…………………………….....……......................................................... Step 36
Tic Tac Toe Assembly and Installation…………………….…….……............... Steps 37-38
Climbing Ropes, Flag Kit, Sandbox Seats/Name Plate, Crown..................... Steps 39-41
Ground Stakes, Steering Wheel …................................................................ Steps 42-43
Center Post and Clatter Bridge Chain Board.................................................. Steps 44-45
PART 2: Clatterbridge Assembly....................................................................... Steps 1-31
PLEASE READ OWNER’S MANUAL CAREFULLY
BEFORE STARTING ASSEMBLY!
TABLE OF CONTENTS
2