
4-1/2"
HEX BOLT
SANDBOX
5/16"
HEX BOLT
WASHER
UPPER LEVEL STEPS/RAILING BOARD
(3 HOLES ON CENTER)
LAG SCREW
UNDER DECK SUPPORT
3/8" X 5"
4 X 4 X 70" UPPER LEVEL
2 X 4 X 70"
(OFFSET UP)
5/16" WASHER
BOARD
4-1/2"
5/16" X
2 X 6 X 70"
5/16" X
3/8"
WASHER
LAG
POST
T-NUT
STEP 24: UPPER LEVEL - RAILING & UNDER DECK SUPPORT
1: PLACE THE 2 X 4 X 70" UPPER LEVEL STEPS/RAILING BOARD (3 HOLES ON CENTER) AT THE TOP OF THE
REAR CORNER POSTS. THIS BOARD WILL GET ATTACHED TO THE 2ND HOLE DOWN FROM THE TOP OF THE
POSTS. THE T-NUT FOR THIS BOARD SHOULD BE ON THE INSIDE OF EACH POST ALREADY. FASTEN THE UPPER
LEVEL RAILING BOARD TO THE REAR CORNER POSTS WITH 5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS.
2: PLACE THE 2 X 6 X 70" SANDBOX BOARD (OFFSET UP) AT THE BOTTOM OF THE REAR CORNER POSTS.
FASTEN THE TOP HOLES IN THE SANDBOX BOARD TO THE REAR CORNER POSTS WITH 5/16" X 4-1/2" HEX
BOLTS AND 5/16" WASHERS.
3: PLACE THE 4 X 4 X 70" UPPER LEVEL UNDER DECK SUPPORT DIRECTLY UNDERNEATH THE UPPER LEVEL
DECK SUPPORTS. ATTACH THE UNDER DECK SUPPORT TO THE REAR CORNER POSTS WITH 3/8" X 5" LAG
SCREWS AND 3/8" WASHERS.
4: HAMMER A T-NUT INTO THE HOLE IN THE LAG POST ON THE RIGHT SIDE OF THE FORT.
73
Summary of Contents for 1500IWF
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 42: ...2 125 6 1000 RPS 5 4 X 6 X 10 ROOF PEAK SUPPORT DESCRIPTION PICTURE QTY 32 ...
Page 140: ...PART II CLATTER BRIDGE 130 ...
Page 169: ...APPENDIX 159 ...
Page 173: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...