BOTTOM BRIDGE RAIL
TOP BRIDGE RAIL
AND 5/16" WASHERS
POSTS ON EACH SIDE WITH
5/16" X 3-1/2" LAG SCREWS
REMOVED FROM VIEW
FOR CLARITY.
ATTACH TOP AND LOWER
BRIDGE RAILS TO CORNER
NOTE: SOME BOARDS
ATTACH
5/4 X 3 X 28-1/4"
PANEL SLAT
WITH 2" WOOD SCREWS
16"
59"
1: PLACE THE BRIDGE RAILS AGAINST THE GREEN CORNER POST AND CENTER CORNER POST ON
THE PLAY SET.
2: LEVEL EACH TOP BRIDGE RAIL AND ATTACH THEM TO THE CORNER POSTS WITH 5/16" X 3-1/2"
LAG SCREWS AND 5/16" WASHERS.
3: MAKE THE BOTTOM OF EACH LOWER BRIDGE RAIL 16" FROM THE TOP OF THE TOP BRIDGE RAIL.
4: ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS WITH 5/16" X 3-1/2" LAG SCREWS
AND 5/16" WASHERS.
5: ATTACH 5/4 X 3 X 28-1/4" PANEL SLAT TO ROPE LADDER SUPPORT AND FRONT FACE BOARD,
NEXT TO THE BRIDGE RAIL WITH 2" WOOD SCREWS.
STEP 14: BRIDGE RAILS TO PLAY SET
144
Summary of Contents for 1500IWF
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 42: ...2 125 6 1000 RPS 5 4 X 6 X 10 ROOF PEAK SUPPORT DESCRIPTION PICTURE QTY 32 ...
Page 140: ...PART II CLATTER BRIDGE 130 ...
Page 169: ...APPENDIX 159 ...
Page 173: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...