1. PRE-DRILL TWENTY 5/4 X 3 X 16" BRIDGE RAIL SLATS ON EACH END WITH A 1/8" DRILL BIT. (SEE TOP IMAGE BELOW)
2. PLACE THE BRIDGE RAIL SLATS 3" FROM THE FACE OF THE CORNER POSTS, AND ATTACH WITH 2" WOOD SCREWS.
THE SLATS WILL MOUNT ON THE OUTSIDE OF THE BRIDGE RAILS.
3. ATTACH THE REMAINING SLATS TO THE UNIT WITH 3" SPACING BETWEEN THE SLATS.
STEP 15: BRIDGE RAIL SLATS
SLAT
5/4 X 3 X 16"
BRIDGE RAIL
2" WOOD SCREW
5/4 X 3 X 16"
BRIDGE RAIL SLAT
3
4
"
"
1 16
5
5
16 "
"
4
1
1 3
1
2X
1
8 "
LEFT SIDE VIEW
3" SPACE OFF CORNER POST
3" SLAT SPACING
145
Summary of Contents for 1500IWF
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 42: ...2 125 6 1000 RPS 5 4 X 6 X 10 ROOF PEAK SUPPORT DESCRIPTION PICTURE QTY 32 ...
Page 140: ...PART II CLATTER BRIDGE 130 ...
Page 169: ...APPENDIX 159 ...
Page 173: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...