2 X 4 X 70"
UPPER LEVEL STEP
3-3/8" GAPS BETWEEN STEPS.
5/16" X 3-1/2"
LAG SCREW
5/16" WASHER
TOPS OF DECK SPACERS FLUSH TO TOP OF UPPER LEVEL STEP
STEP 43: UPPER LEVEL STEPS
1: PLACE THE TOP OF ONE 2 X 4 X 70" UPPER LEVEL STEP FLUSH WITH THE TOP OF THE
UPPER LEVEL DECK SPACERS. UPPER LEVEL STEPS HAVE THREE HOLES THAT ARE
CENTERED.
2: ATTACH THE UPPER LEVEL STEP TO THE POSTS WITH THREE 5/16" X 3-1/2" LAG SCREWS
AND THREE 5/16" WASHERS.
3: LEAVE A 3-3/8" GAP BETWEEN THE UPPER LEVEL STEP YOU JUST INSTALLED AND THE
NEXT UPPER LEVEL STEP. ATTACH THE NEXT UPPER LEVEL STEP WITH THREE 5/16" X 3-1/2"
LAG SCREWS AND THREE 5/16" WASHERS.
4: REPEAT SUBSTEP 3 TO INSTALL THE NEXT TWO UPPER LEVEL STEPS.
92
Summary of Contents for 1500IWF
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 42: ...2 125 6 1000 RPS 5 4 X 6 X 10 ROOF PEAK SUPPORT DESCRIPTION PICTURE QTY 32 ...
Page 140: ...PART II CLATTER BRIDGE 130 ...
Page 169: ...APPENDIX 159 ...
Page 173: ...DESCRIPTION PICTURE QTY 2 RIGHT SIDE DORMER 07 0031 ASSEMBLY PLASTIC DORMER SUNBURST 2 ...