Speed Setting of Circulation Pump P0 ............................................................62
Working Mode of Circulation Pump P0 ............................................................62
P2 with High Temp. Demand .......................................................................63
Floor Curing Current Stage Running Duration .................................................64
Floor Curing Current Stage Set Temperature ..................................................64
Floor Curing Current Stage Valid Running Duration ........................................64
Highest Water Temp. in Floor Curing Operation ..............................................64
Ambient Temp. to Start Heating Eco Operation ...............................................66
Motorized Diverting Valve switching time ........................................................67
Power on Time for Motorized Diverting Valve ..................................................67
Summary of Contents for Aerogor ECO COMPACT INVERTER 10A
Page 2: ......
Page 88: ...81 10 WIRING 10 1INDOOR UNIT ALL INVERTERS REFERS TO AS LINE OF HEAT PUMPS...
Page 89: ...82 INDOOR UNIT ALL INVERTERS...
Page 91: ...84 10 3OUTDOOR PCB ECO INVERTER...
Page 92: ...85 OUTDOOR PCB ECO INVERTER...
Page 93: ...86 10 4DRIVE FOR EEV ECO INVERTER 13A and ECO COMPACT INVERTER 13A...
Page 94: ...87 10 5OUTDOOR UNIT POWER EVI INVERTER 15A 18A...
Page 95: ...88 OUTDOOR UNIT POWER EVI INVERTER 15A 18A...
Page 96: ...89 10 6OUTDOOR UNIT DRIVE AEROGOR POWER EVI 15A 18A...