Global Power Technologies
2-2
5120
Mount the TEG to a firm and stable base, using 1/4-20 bolts, See Appendix Figure 42, page
7-2, for mounting hole locations. The base must be level and sturdy enough to support the
41 kg (90 lb) TEG. The TEG should be mounted high enough to avoid direct flooding or heavy
snowfall interfering with the flow of cooling air. Allow a minimum of 150 mm (6 in.) clearance
under the cooling fins.
WARNING: Operation of the TEG in locations where cooling air flow may be
obstructed will cause overheating of the TEG .
Figure 2
Assembling TEG
Summary of Contents for 5060
Page 2: ......
Page 4: ......
Page 6: ... ...
Page 8: ......
Page 10: ...Global Power Technologies 1 2 5120 ...
Page 15: ...Global Power Technologies 1 7 5120 ...
Page 27: ...Global Power Technologies 2 12 5120 Figure 13 Wiring Diagram 5120 TEG ...
Page 35: ...Global Power Technologies 3 8 5120 Figure 18 Burner Assembly ...
Page 47: ...Global Power Technologies 3 20 5120 ...
Page 50: ...Global Power Technologies 4 3 5120 Figure 26 220 Watt L C Connection and Adjustment Details ...
Page 51: ...Global Power Technologies 4 4 5120 ...
Page 55: ...Global Power Technologies 5 4 5120 Figure 30 Cathodic Protection System Parts Identification ...
Page 57: ...Global Power Technologies 5 6 5120 ...
Page 63: ...Global Power Technologies 6 6 5120 Figure 33 Exhaust Stack Removal ...
Page 75: ...Global Power Technologies 7 2 5120 7 2 Physical Dimensions Figure 42 Physical Description ...