Global Power Technologies
6-11
5120
f)
Feed the electrode through the hole in the mounting pin, then the hole in the mounting
bracket and through the electrode hole in the burner back. Adjust the spark gap as
directed in the appropriate section of the TEG operating manual.
g)
Tighten the wing nut only until it is snug.
Caution:
Do not over tighten the wing nut or the ceramic rod will crack.
h)
Connect the high voltage spark wire to the electrode.
6 .4 .3 Install Rain Cap Assembly:
Figure 38 shows the installation of the Rain Cap Assembly.
a)
Using the mounting flange as a template, drill 4 holes (9/16 diameter) in the top of the
cabinet.
b)
Install the rain cap assembly in the large hole in the cabinet top, centered over the flame
arrestor inner stack.
c)
Install the mounting flange from inside the cabinet. Use the 1/4-20 Hex head screws,
washers and nuts to fasten
in place.
Figure 38
Rain Cap Installation
Summary of Contents for 5060
Page 2: ......
Page 4: ......
Page 6: ... ...
Page 8: ......
Page 10: ...Global Power Technologies 1 2 5120 ...
Page 15: ...Global Power Technologies 1 7 5120 ...
Page 27: ...Global Power Technologies 2 12 5120 Figure 13 Wiring Diagram 5120 TEG ...
Page 35: ...Global Power Technologies 3 8 5120 Figure 18 Burner Assembly ...
Page 47: ...Global Power Technologies 3 20 5120 ...
Page 50: ...Global Power Technologies 4 3 5120 Figure 26 220 Watt L C Connection and Adjustment Details ...
Page 51: ...Global Power Technologies 4 4 5120 ...
Page 55: ...Global Power Technologies 5 4 5120 Figure 30 Cathodic Protection System Parts Identification ...
Page 57: ...Global Power Technologies 5 6 5120 ...
Page 63: ...Global Power Technologies 6 6 5120 Figure 33 Exhaust Stack Removal ...
Page 75: ...Global Power Technologies 7 2 5120 7 2 Physical Dimensions Figure 42 Physical Description ...