
Refitting the head and timing system components
• Carefully clean the head, removing any carbon
residues
• Check the perfect condition of the fitting surfaces
• Check that the O-rings are not broken, otherwise
replace them
• Screw the 4 head fixing nuts and tighten them in
crossed sequence to the prescribed torque
Locking torques (N*m)
Head fixing nuts:
10 ÷11 Nm
• Refit the head inside recirculation duct as shown
in the figure.
• Check that the O-Ring is in good working condi-
tion.
• Fit the coolant outlet union on the head with rel-
evant O-ring by tightening 2 screws to the prescri-
bed torque.
Locking torques (N*m)
Coolant outlet union fixing screws:
3 ÷ 4 Nm
• Introduce the air injector into the head.
Runner Purejet
Engine
ENG - 85
Summary of Contents for Runner Purejet 2007
Page 1: ...WORKSHOP MANUAL 633499 Runner Purejet ...
Page 5: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 15: ...INDEX OF TOPICS TOOLING TOOL ...
Page 26: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 35: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 39: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 54: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 61: ...INDEX OF TOPICS ENGINE ENG ...
Page 101: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 112: ...INDEX OF TOPICS PURE JET INJECTION INJ PJ ...
Page 180: ...B Fixed pure jet injection Runner Purejet INJ PJ 180 ...
Page 181: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 190: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 196: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 206: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 210: ...INDEX OF TOPICS TIME TIME ...