
Refitting
When refitting, tighten the shock absorber/frame anchorage nut and the shock absorber/engine pin at
the prescribed torque.
Locking torques (N*m)
Shock absorber/frame nut torque
20 to 25 Nm
Shock absorber/engine pin torque
33 to 41 N·m
Centre-stand
Expulsion of kickstand bracket fastening pin
- Remove the stand support bracket from the en-
gine.
- Drill a 5 mm hole in the bracket so that the pin
«P» can come out.
Fitting and caulking the kickstand pin to the bracket
- Caulk the end of the pin «P» between the two
punches shown in the figure.
- After caulking it must be possible for the stand to
turn freely.
N.B.
UPON REFITTING USE NEW O-RING AND PIN, GREASE
THE SPRING ATTACHMENTS AND THE PIN.
Replacing full kickstand
- Loosen the three screws shown in the diagram.
- When refitting, secure to the prescribed torque.
Locking torques (N*m)
Stand screw torque
18.5 to 19 Nm
Runner Purejet
Suspensions
SUSP - 111
Summary of Contents for Runner Purejet 2007
Page 1: ...WORKSHOP MANUAL 633499 Runner Purejet ...
Page 5: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 15: ...INDEX OF TOPICS TOOLING TOOL ...
Page 26: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 35: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 39: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 54: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 61: ...INDEX OF TOPICS ENGINE ENG ...
Page 101: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 112: ...INDEX OF TOPICS PURE JET INJECTION INJ PJ ...
Page 180: ...B Fixed pure jet injection Runner Purejet INJ PJ 180 ...
Page 181: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 190: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 196: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 206: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 210: ...INDEX OF TOPICS TIME TIME ...