Appendix D: CPC Installation Site Survey
Outside Store Demographics
Page D-6 MDE-4318D Competitive Pump and CRIND (CPC) Hardware/Software Start-up and Service Manual · May 2010
Electrical Information
AC Panel/Breakers:
Is the site equipped with a known, good ground rod/system?
Is all the POS equipment on the same phase?
Is each dispenser on its’ own breaker?
Is there adequate space in the A/C panel to add breakers for new POS equipment?
Is an additional sub-panel required?
Is there a isolated ground receptacle available for the CPU/Server?
Is there a isolated ground receptacle available for the Tower/Client Terminal?
Is there a UPS or surge support system for the SITE/POS installed?
Wire Trough/ Conduit:
Are the POS Data Cables and Power Cables in a separate
wire trough?
Are the LAN Cables installed to meet TIA-568A Standards?
Does the Manager have a LAN Test Report From LAN installer?
Are the dispenser Data Cables and Power Cables in a separate
conduit?
Are any wires for variable speed motors located near any Gilbarco Data Cables?
(For example, FE Petroserve, Red Jacket™, and so on)
Are there an adequate Number of Dedicated I/G Outlets for Passport POS equipment and
the peripheral devices?:
Front Counter:
Tower Units:
Back Room:
Fueling Position
17/18
19/20
21/22
23/24
Pump Information/Description
Model #
Software version
CAT Information
o
N
s
e
Y
o
N
s
e
Y
o
N
s
e
Y
o
N
s
e
Y
?
D
I
F
R
2 x 16 dual line
4 x 21 dual line
64 x 240 4-line
10.4” VGA
480 x 640 Color
Display Type
10.4” Full Motion Video
2 x 16 dual line
4 x 21 dual line
64 x 240 4-line
10.4” VGA
480 x 640 Color
10.4” Full Motion Video
2 x 16 dual line
4 x 21 dual line
64 x 240 4-line
10.4” VGA
480 x 640 Color
10.4” Full Motion Video
2 x 16 dual line
4 x 21 dual line
64 x 240 4-line
10.4” VGA
480 x 640 Color
10.4” Full Motion Video
CAT Software Version
CAT Printer Type
Robust
Tear Bar
Robust
Tear Bar
Robust
Tear Bar
Robust
Tear Bar
ADA available;
At CRIND
At Nozzle put-down
Cash
Acceptors
Installed
Yes No
Yes No
Yes No
Yes No