Appendix D: CPC Installation Site Survey
Inside Store Demographics
Page D-2 MDE-4318D Competitive Pump and CRIND (CPC) Hardware/Software Start-up and Service Manual · May 2010
Inside Store Demographics
POS Installed
Note: Use this section if a third-party POS exists, which will be replaced with the Passport
system.
Note: Use this section for G-SITE system to Passport system upgrades.
G-SITE Information
Reports Information
.
y
e
v
r
u
s
e
t
i
s
d
e
t
e
l
p
m
o
c
s
i
h
t
h
t
i
w
g
n
o
l
a
t
r
o
p
e
R
n
o
i
t
a
r
u
g
i
f
n
o
C
E
T
I
S
-
G
e
s
o
l
c
n
e
d
n
a
t
n
i
r
P
Print and enclose CPC Plug-In Configuration Report along with this completed site survey.
Number of existing workstations 1
2
3
4
Is There Adequate Shelf Space Under the Counter for the CPU, Tower Unit and the Line Printer?
(Space Needed - 10
”
W x15
”
H x22
”
D per each CPU and Tower Unit)
Scanner -
How many are installed?
- Who is the manufacturer of the scanner(s) installed?
Quantity of UPCs/PLUs -
Less than 2,500
Less than 10,000
More than 10,000
Network Connectivity
What type of network connection does this site have?
Satellite) Lease
Line) Dial)