Instruction Manual BCF Plus
13 Menu structure and work sequence
(11.15) BCF Plus_BA_04
19
1. Select pipe data (press 1x
).
2. Confirm with the
ENTER button.
3. Choose the right material:
PVDF / PP-N with
.
4. Confirm with the
ENTER button.
5. Confirm pressure with the
ENTER button.
6. Check values and confirm with the
ENTER button.