4 Installation
4.1
Preparations to be made by the customer
4.2
Installation
Installing profiles
1. Align mounting profile on installation surface and use as drilling jig.
2. Drill holes in accordance with the on-site conditions (see installation diagram).
3. Prepare cable routing in accordance with local conditions, for example:
– Hold free (right) end piece on left side of mounting profile and copy to cable
gland.
– Remove mounting profile at marked position.
1 Mounting profile
2 Bolt lock
3 Shim (supplied by customer)
4 Lower edge of bolt lock
4. Only for post/bolt lock design:
Align mounting profile with lower edge of bolt lock.
5. Screw on the mounting profile. Watch the shim (3) for post/bolt lock design here
(see installation diagram).
6. Install light barrier profiles/sealing strips in accordance with on-site conditions
(see installation diagram).
7. Install light barriers and fix in place (see interconnection diagram).
8. Press sealing rubber into sealing strips.
Check the preparations made by the customer to ensure proper installation:
•
Type and loading capacity of the facade construction or sub-construction
•
Levelness of the installation surface
•
Requirements of the interconnection diagram
•
Secure workplace against unauthorised entry.
•
Always perform work with a second technician.
•
Use stepladder or stepstool.
•
Keep inside area of runner clean.