Check & Adjust -3
3-17
Battery check
1.
Demolition -
> Battery cable
By:
> First demolition of the battery cable
(-) negative, then split the battery
lead (+) positive.
2 check - battery voltage
Tools: multimeter
Ways: (+) red probe is connected to the positive terminal
(-) black Probe is connected negative terminal
State
voltage
method
Fully
12.8V or more
-
Charging
12.3V~12.7V
to charge
No electricity
12.3V following
to charge
(Minimum start-up voltage: 12.3V)
3. Charging current / time: the 0.9A / 5 ~~ 10 hours
Note:
1)Do not rapid charge.
2)Sealed battery cover Never open the battery cover so will lead to the battery internal imbalances degrade
performance.
3)In order to give full play to the battery performance battery before use the battery implementation of the initial
charge.
4)New battery added to the electrolyte, allowed to stand for 10 to 30 minutes or more and then into the sealing cap,
allows the electrolyte completely soaked pole portions, i.e. with fully characteristics.
5)Locomotive unused for long periods: When the locomotive is not used for long,please be placed before the first
supplementary charge, at the same time remove the negative terminal, preservation, custody during a monthly
supplement electric once only please.
4.Installation:
> Battery cable
By:
1)First install the battery lead (+) positive,and then installed the battery cable
(-) negative.
2)Positive / negative terminal smear on the butter.
.
58