6. Align the lo cat ing pins with the slots in the mount ing plat form on the hel met. In sert
the pins into the slots and pull the mount down un til it clicks into place as shown in
Fig ure 2-15. At tach the hook fas tener on the con nec tor to the pile fas tener (not
pro vided) on vi sor the hous ing.
7. At tach pres sure-sen si tive pile fas tener to the cen ter rear of the hel met for the ANVIS
bat tery pack as shown in Fig ure 2-15.
8. To re move the mount from the hel met, de press the re lease tab on top of the mount -
ing plat form and lift the mount up and away.
2-14
Fig ure 2-15. ANVIS Kit In stal la tion (*P/N 90A7946-5)
ANVIS RE LEASE TAB
ANVIS NVG MOUNTING PLAT FORM
*PILE FAS TENER
(AP PROX I MATELY
2” X 2”)
FRONT
* POWER PACK
PILE FAS TENER
POWER PACK, CFE
ANVIS MOUNT, CFE
REAR