MULTILINK ML810 MANAGED EDGE SWITCH – INSTRUCTION MANUAL
2–1
Multilink ML810
Ethernet Communications Switch
Chapter 2: Introduction
GE Energy
Introduction
2.1
Inspecting the Package and Product
Examine the shipping container for obvious damage prior to installing this product; notify
the carrier of any damage that you believe occurred during shipment or delivery. Inspect
the contents of this package for any signs of damage and ensure that the items listed
below are included.
This package should contain:
1 Multilink ML810 Managed Edge Switch, base unit (configured with user-selected
port module options installed)
2 Set of two metal vertical mounting brackets, with screws to the case
1 ML810 Installation and User Guide (this manual)
Remove the items from the shipping container. Be sure to keep the shipping container
should you need to re-ship the unit at a later date.
In the event there are items missing or damaged, contact GE Digital Energy. If the unit
needs to be returned, please use the original shipping container if possible.