B–6
MULTILINK ML810 MANAGED EDGE SWITCH – INSTRUCTION MANUAL
ML810, 12, 24, –48, 125 AND 250VDC INSTALLATION
CHAPTER B: DC POWER INPUT
4.
“Complies with FDA radiation performance standards, 21 CFR subchapter J.” or
equivalent.
5.
Fastening torque of the lugs on the terminal block: 9 inch-pound max.
6.
To secure a centralized DC Power Source cable , use at least four cable ties to secure
the cable to the rack at least 4 inches apart, with the first one located within 6 inches
of the terminal block.
7.
Internal fuses are NOT user-replaceable; please contact GE Service.
8.
This product is to be installed ONLY in Restricted Access Areas (dedicated equipment
rooms, electrical closets, etc.)
9.
The external power supply for DC units shall be a listed Direct Plug-In power unit,
marked Class 2, or listed ITE Power Supply marked LPS, which has suitably rated
output voltage (ie: 12 VDC, 24 VDC, or 48 VDC) and suitably rated output current.
10.
Disconnect all power sources before servicing
.