D–2
MULTILINK ML810 MANAGED EDGE SWITCH – INSTRUCTION MANUAL
CHAPTER D: FIELD INSTALLATION INSTRUCTIONS FOR SLOT C MODULE
• Remove existing Slot C panel by removing qty. 2 screws securing Slot C panel to
case, and set aside the Slot C panel and these 2 screws.
2.
Prepare Slot C to accept module:
• a. Add new Slot C panel, included with kit, to the location vacated by Step 1d.
Tighten with minimal force (5 in-lbs. max.)
• b. Remove qty. 4 (qty. 6 for 5.5” PCB) screws from Main PCB.
• c. Install qty. 4 (qty. 6 for 5.5” PCB) standoffs, included with kit, into the locations
vacated by Step 2b. Tighten with minimal force (5 in-lbs. max.)
3.
Install module:
• a. Locate the module connector on the main board. Grasp the module and guide it
from the interior into the Slot C panel at a slight angle to avoid damaging the
module connector and the main PCB module connector.
• b. Align the module connector and the Main PCB connector. (Connectors are multi-
pin, beige in color) After alignment is made, push the module carefully with
minimal force, down, to fully mate with the main PCB.
• c. Install qty. 4 (qty. 6 for 5.5” PCB) screws (from Step 2b) into the stand-offs to
secure the module.
• d. Re-install ML810 case cover (torque case cover screws to 5 in-lbs. max.)
See the illustrations below for additional visual information on the overall process.
Step 1d: Remove panel (blank shown)
Step 2a: Add new panel
Step 2b: Remove Main PCB screws
Step 2c: Install stand-offs
Step 3a: Locate Main PCB connector
Step 3b: Guide module into panel
Step 3c: Secure module
Step 3d: Module options (dependant on configuration ordered)