MULTILINK ML810 MANAGED EDGE SWITCH – INSTRUCTION MANUAL
3–1
Multilink ML810
Ethernet Communications Switch
Chapter 3: Installation
GE Energy
Installation
CAUTION
Before installing the equipment, it is necessary to take the following precautions:
• If the equipment is mounted in an enclosed or multiple rack assembly, the steady-
state long-term environmental temperature around the equipment must be less
than or equal to 60
0
C.
• If the equipment is mounted in an enclosed or multiple rack assembly, adequate
airflow must be maintained for proper and safe operation.
• If the equipment is mounted in an enclosed or multiple rack system, placement of
the equipment must not overload or load unevenly the rack system.
• If the equipment is mounted in an enclosed or multiple rack assembly, verify the
equipment’s power requirements to prevent overloading of the building/s
electrical circuits.
• If the equipment is mounted in an enclosed or multiple rack assembly verify that
the equipment has a reliable and uncompromised earthing path.
This section describes installation of the Multilink ML810 Switches, as well as connection of
the various Ethernet media types.