
H-2
G30 Generator Protection System
GE Multilin
H.1 CHANGE NOTES
APPENDIX H
H
Table H–3: MAJOR UPDATES FOR G30 MANUAL REVISION AA4
PAGE
(AA3)
PAGE
(AA4)
CHANGE
DESCRIPTION
---
---
Update
General revision, including updated branding from GE Digital Energy to GE Grid Solutions
---
---
Delete
Deleted EAC logo from title page and deleted EAC certification from Approvals specifications
because document not translated into Russian
Table H–4: MAJOR UPDATES FOR G30 MANUAL REVISION AA3
PAGE
(AA2)
PAGE
(AA3)
CHANGE
DESCRIPTION
---
---
Update
General revision throughout document
---
---
Update
Updated numbers of elements throughout document
---
---
Add
Added EAC compliance information throughout, including logo on title page, rear panel, added
specifications, added life expectancy and decommissioning, added sections on Uninstall and
Clear Files and Data, Repairs, Storage, and Disposal
2-17
2-17
Add
Added UR Signal Processing section
4-22
4-22
Delete
Deleted Standard Faceplate section on how to customize LED and blank panels. Clear Lexan
front cover (part number 1501-0014) no longer being sold. Units with blank LED panels no longer
being sold.
5-130
5-130
Update
Updated FlexLogic operands table
A-
A-
Update
Updated FlexAnalog and FlexInteger tables
B-
B-
Update
Updated Modbus memory map and F codes
Table H–5: MAJOR UPDATES FOR G30 MANUAL REVISION AA2
PAGE
(AA1)
PAGE
(AA2)
CHANGE
DESCRIPTION
---
---
Update
General revision throughout document
---
---
Update
Updated references to digital inputs/outputs to contact inputs/outputs for consistency
2-1
2-1
Update
Updated Table 2-1 ANSI device table and single-line diagrams
5-23
5-23
Add
Added Syslog Format section
5-31
5-31
Add
Added Far-End Fault Indication (FEFI) section
5-182
5-182
Add
Added Split Phase Function setting to enabled and disable the function
B-
B-
Update
Updated Modbus memory map and F codes
H-7
H-7
Update
Updated product warranty from 24 months to 10 years
Table H–6: MAJOR UPDATES FOR G30 MANUAL REVISION AA1
PAGE
(Z1)
PAGE
(AA1)
CHANGE
DESCRIPTION
---
---
Add
Added content for IEC 60870-5-103 throughout document
2-
2-
Update
Updated order codes
2-
2-
Update
Updated specifications
8-
---
Delete
Deleted chapter 8 on security, moving content to other chapters
---
10-
Add
Added Maintenance chapter, moving content from other chapters and adding new instructions to
replace the battery
---
D-
Add
Added new appendix on IEC 60870-5-103 interoperability
Summary of Contents for G30
Page 10: ...x G30 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Page 30: ...1 20 G30 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 414: ...5 274 G30 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 484: ...11 12 G30 Generator Protection System GE Multilin 11 6 DISPOSAL 11 MAINTENANCE 11 ...
Page 512: ...A 28 G30 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 620: ...B 108 G30 Generator Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Page 666: ...E 10 G30 Generator Protection System GE Multilin E 1 IEC 60870 5 104 APPENDIX E E ...
Page 678: ...F 12 G30 Generator Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...