10-2
G30 Generator Protection System
GE Multilin
10.1 TESTING
10 COMMISSIONING
10
The desired delay time is the interval from the point the frequency crosses the set threshold to the point the element oper-
ates. Some test sets can measure only the time from the ramp start to element operation, necessitating the subtraction of
the pre-threshold ramp time from the reading. For example, with a ramp rate of 0.20 Hz/s, start the ramp 0.20 Hz before the
threshold and subtract 1 second from test set time reading of ramp start to relay operation.
Note that the G30 event records only show the “pickup delay” component, a definite time timer. This is exclusive of the time
taken by the frequency responding component to pickup.
The G30 oscillography can be used to measure the time between the calculated source frequency crossing the threshold
and element operation; however, this method omits the delay in the calculated source frequency. The security features of
the source frequency measurement algorithm result in the calculated frequency being delayed by 2 to 4 cycles (or longer
with noise on the input). In addition, oscillography resolution is 0.004 Hz, which at 0.20 Hz/s corresponds to a delay of
20 ms. The tracking frequency should not be used in timing measurements, as its algorithm involves phase locking, which
purposely sets its frequency high or low to allow the G30 sample clock to catch-up or wait as necessary to reach synchro-
nism with the power system.
Summary of Contents for G30
Page 10: ...x G30 Generator Protection System GE Multilin TABLE OF CONTENTS ...
Page 30: ...1 20 G30 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 414: ...5 274 G30 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 484: ...11 12 G30 Generator Protection System GE Multilin 11 6 DISPOSAL 11 MAINTENANCE 11 ...
Page 512: ...A 28 G30 Generator Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 620: ...B 108 G30 Generator Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Page 666: ...E 10 G30 Generator Protection System GE Multilin E 1 IEC 60870 5 104 APPENDIX E E ...
Page 678: ...F 12 G30 Generator Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...